The
Integrated Five-Year Work Plan
Implementing
the Strategic Plan
ACHD Supports
You However You Choose to Travel
ACHD’s
Complete Streets Guiding Principle
ACHD Serves
You When You Drive
Managing the
Congestion You Face
Increasing
Access with a Low-Stress Network
Building the
Right Bike Facilities for You
Building
Sidewalks Where You Want Them
Filling Key
Gaps in the Sidewalk Network
Improving
Your Access to Where You Want to Go
Improving
Pedestrian Ramp Accessibility
Improving
Sidewalk Accessibility
Providing
Accessible Pedestrian Signals
Improving
Pedestrian Push Button Accessibility
Additional
Capital Improvements and Safety Projects
Bicycle and
Pedestrian Safety Improvements
Proactively
Addressing Environmental Regulations
Neighborhood
Investments Where You Live
ACHD’s Vision – Leading Transportation Innovation – Investing in Communities
The 2022-2026 Integrated Five-Year Work Program (IFYWP) sets forth the strategies, projects and priorities which the Ada County Highway District (ACHD) will pursue over the next five years. The first two years of the Plan align with ACHD’s 2022 Budget, adopted on August 25, 2021. The remaining years set the focus for ACHD’s efforts for future budget years. The document allows elected officials, staff, partner agencies, and the public to work in a coordinated fashion to implement projects.
The Integrated
Five-Year Work Plan works in support of various ACHD and partner agency
foundational planning documents and is the implementing arm for these plans.
Starting with the City and County Comprehensive Plans, the land use vision is
established. The region’s Long-Range Transportation Plan, Communities in
Motion 2.0 2040, uses this vision to make demographic projections and to
create a travel demand model. These products helped inform ACHD Strategic Plan,
which sets for a focus on asset management and defines the allocation of
resources. Implementing the Strategic Plan is done through projects identified
as part of ACHD’s asset management plans, the 2019 ADA Transition Plan, the
Bike Master Plan, Neighborhood Plans, and the Capital Improvement Plan. The
projects identified through these plans filter into the Integrated Five-Year
Work Plan and Budget.
ACHD established its vision, mission, and priorities in 2011, with the intent of ensuring that all ACHD activities are focused on the best interest of the citizens we serve. The bottom line is that every choice ACHD makes must help to effectively and efficiently accomplish ACHD’s Vision, Mission and Priorities.
In June 2016, the ACHD Commission adopted a Strategic Plan to further clarify the intent of its vision, mission, and priorities. The Plan included a resource allocation methodology that informs and guides development of the IFYWP. That methodology, further revised in 2019, guides the programming and project selection decisions for the IFYWP.
1. SAFETY & MAINTENANCE
a. Signals, Crossings, and Safety Projects
b. Asset Management – Capital Maintenance & Bridges
2. SYSTEM ENHANCEMENTS
a. Neighborhood Plan & Bike Master Plan Projects (Not funded by Vehicle Registration Fees)
b. Capital Improvement Plan Projects
+. PROGRAMMING OBLIGATIONS
a. ADA and Environmental Compliance
b. Vehicle Registration Fee (VRF) Ballot Commitments
c. General Fund Support of Impact Fee Collections
Streets, bridges and transit stops within Ada County should be designed, constructed, operated and maintained so that pedestrians, bicyclists, transit riders, motorists, and people of all ages and abilities can travel safely and independently. (ACHD Policy Manual Section 3110.2)
A Complete Street provides options and connections to get you to where you want to go. Not every street will look the same, but generally a Complete Street will have safe sidewalks for all abilities, appropriate bike facilities, adequate space for cars and buses, with all being well maintained for all users.
ACHD updated its Capital Improvement Plan in 2020. This plan shows roads and intersections that ACHD expects will need widened to address growth in the next 20-years. It also drives the collection of impact fees to pay for those projects. To learn more about this plan, visit https://www.achdidaho.org/Departments/Engineering/DevelopmentServices/impactFees.aspx. The IFYWP is the primary implementation tool to build out the Capital Improvement Plan. ACHD is projected to collection $125 million in Impact Fees between 2022 and 2026.
- 34% Complete Total Planned Lane Miles – A 2% increase from Annual Report
- 12% Programmed Total Planned Lane Miles – A 3% increase from Annual Report
- 128 New Lane Miles Programmed in the IFYWP
- 49 Intersection Improvements Programmed in the IFYWP
- 27 Programmed IFYWP Projects to Address Congested Locations – A 3 project increase from Annual Report
- 20 Unfunded Projects Needed to Address Congested Locations Due to Lack of Funding – A 4 project decrease from Annual Report
Starting this year, ACHD established a Bikeway Signage program to accelerate implementation of the Low-Stress Bike Network. This bikeway sign is used to identify low-stress bikeways and key connections linking them.
- 24% Complete Miles of Low-Stress Bikeway Network – A 2% increase from the Annual Report
- 37% Programmed Miles of Low-Stress Bikeway Network – A 10% increase from the Annual Report
- 21% of Population Within ¼ Mile of a Complete Low-Stress Network – A 2% increase from the Annual Report
- 59% of Population Within ¼ Mile of a Complete or Programmed Low-Stress Network – A 19% increase from the 2021-2025 IFYWP
- Level 3 Bike Facilities
o 30 Built Miles
o 47 Programmed Miles – A 17-mile increase from the Annual Report
o 166 Future Miles – A 19-mile decrease from the Annual Report
- Level 2 Bike Facilities
o 143 Built Miles
o 16 Programmed Miles – A 5-mile increase from the Annual Report
o 164 Future Miles – A 6-mile decrease from the Annual Report
- Level 1 Bike Facilities
o 239 Built Miles
o 147 Future Miles
- 43% of the Planned Bike Network is Built
ACHD uses its Neighborhood Plans to determine what local streets will have sidewalks. To find your Neighborhood Plan, visit https://www.achdidaho.org/Projects/projects.aspx. Make sure to participate when ACHD is in your neighborhood.
- Arterials
o 182 Built Miles – A 2-mile increase from the Annual Report
o 41 Programmed Miles – A 14-mile increase from the Annual Report
o 202 Future Miles
- Collectors
o 167 Built Miles – A 2-mile increase from the Annual Report
o 16 Programmed Miles – A 6-mile increase from the Annual Report
o 94 Future Miles
- Locals
o 1,236 Built Miles
o 5 Programmed Miles – A 2-mile increase from the Annual Report
o 22 Future Miles
- 9 Built Miles – A 2-mile increase from the Annual Report
- 38 Programmed Miles – A 12-mile increase from the Annual Report
- 77 Total Miles of Gaps
- Population Within A 1 Mile Walk of Key Destinations
o Schools – 78% of the Population
o Parks – 66% of the Population
o Bus Stops – 45% of the Population
o Grocery Stores – 40% of the Population
- High Priority Locations
o Identified – 1,766 Curb Ramps
o Complete – 237 Curb Ramps (14 More Than Annual Report)
o Programmed – 449 Curb Ramps (192 More Than Annual Report)
o Future – 1080 Curb Ramps (229 Less Than Annual Report)
- Medium Priority Locations
o Identified – 1786 Curb Ramps
o Complete – 92 Curb Ramps (27 More Than Annual Report)
o Programmed – 327 Curb Ramps (304 More Than Annual Report)
o Future – 1327 Curb Ramps (190 Less Than Annual Report)
- Low Priority Locations
o Identified – 9,918 Curb Ramps
o Complete – 1,364 Curb Ramps (1,050 More Than Annual Report)
o Programmed – 567 Curb Ramps (228 More Than Annual Report)
o Future – 7,990 Curb Ramps (1,088 Less Than Annual Report)
- High Priority Locations
o Identified – 59.5 Miles of Sidewalk
o Complete – 14.9 Miles of Sidewalk (14.2 More Than Annual Report)
o Programmed – 8.8 Miles of Sidewalk (3.9 More Than Annual Report)
o Future – 36.8 Miles of Sidewalk (17.8 Less Than Annual Report)
- Medium Priority Locations
o Identified – 226.3 Miles of Sidewalk
o Complete – 18.9 Miles of Sidewalk (10.3 More Than Annual Report)
o Programmed – 26.0 Miles of Sidewalk (18.5 More Than Annual Report)
o Future – 181.4 Miles of Sidewalk (29.1 Less Than Annual Report)
- Low Priority Locations
o Identified – 773.2 Miles of Sidewalk
o Complete – 50.3 Miles of Sidewalk (45.8 More Than Annual Report)
o Programmed – 31.0 Miles of Sidewalk (17.6 More Than Annual Report)
o Future – 692.4 Miles of Sidewalk (61.3 Less Than Annual Report)
- 186 Completed Intersections with Accessible Pedestrian Signals (15 More Than Annual Report)
- 119 Programmed Intersections with Accessible Pedestrian Signals (21 More Than Annual Report)
- High Priority Locations
o Identified – 859 Push Buttons
o Complete – 29 Push Buttons (23 More Than Annual Report)
o Programmed – 140 Push Buttons (9 More Than Annual Report)
o Future – 690 Push Buttons (32 Less Than Annual Report)
- Medium Priority Locations
o Identified – 401 Push Buttons
o Complete – 1 Push Button (1 More Than Annual Report)
o Programmed – 37 Push Buttons (4 More Than Annual Report)
o Future – 363 Push Buttons (5 Less Than Annual Report)
- Low Priority Locations
o Identified – 487 Push Buttons
o Complete – 7 Push Buttons (1 More Than Annual Report)
o Programmed – 45 Push Buttons (10 More Than Annual Report)
o Future – 435 Push Buttons (11 Less Than Annual Report)
Additionally, ACHD has 18,324 ramps, 1765 miles of sidewalk and 477 pedestrian push buttons where no deficiencies have been identified through its ADA Transition Plan inventory process. The data is constantly updated. The inventory was reconciled as part of this report.
The funding plan portion of the IFYWP focuses external funding efforts on the Commission’s approved focus areas adopted in the ACHD Strategic Plan (2016). External funding comes from funding sources that are not codified by State of Idaho code or fee regiment for use by the Ada County Highway District, with most of these funds coming from Federal Highway Administration programs. The funding plan ensures funding application efforts are timely and supported by the Commission. All local match funding will be reviewed and approved by Commission when the project agreement is presented for approval.
Seeking external funding for maintenance, safety and Americans With Disabilities Act (ADA) projects is a primary focus area of the Strategic Plan.
ACHD currently receives Surface Transportation Block Grant Program (STBG) Transportation Management Area (TMA) funding for qualified, capital improvements on Federal-aid Highway System Arterials and Collectors. Per Communities in Motion 2040, COMPASS programs 82% of STBG TMA funding for ACHD’s roadway improvement needs, including but not limited to overlays, reclaims, rebuilds and micro seals. Starting in 2021, the Commission directed staff to take an integrated approach to all maintenance projects, which now includes evaluating all sidewalk and bike facility needs. The federal match requirement for STBG funding is 7.34% of project cost. Federal improvement projects and treatments are identified by Pavement Management staff at the time of design.
The following estimated five-year capital improvement need is based on ACHD’s Pavement Management Engineer’s evaluation of the StreetSaver Model’s Pavement Condition Index (PCI) data. This data is updated annually for Ada County arterials, collectors and residential streets. Funding also includes House Bill 312 maintenance funding.
· Federal Aid Funding Need by Year
o 2022 - $10.6 Million
o 2023 - $9.0 Million
o 2024 - $7.8 Million
o 2025 - $7.3 Million
o 2026 - $7.1 Million
Outside of the STBG-TMA program, there are several competitive funding programs that are administrated by FHWA, FTA, FEMA, ITD and LHTAC. Each of these programs has its own set of restrictions and funding limitations. For example, programs such as STBG-Urban funds may be used for capital improvements projects within the cities of Kuna or Star, and STBG-Rural funds may be used in Ada County outside of the TMA and Urban boundaries.
The following is a list of additional Primary Focus projects that staff will seek outside funding:
Project Name Fairview Ave Bridges #2196 & #2197
Project
Description Reconstruct the existing deficient bridges over the
Boise River
Cost $8.4M
Local Match $0.6M to $3.4M
Possible
Funding RAISE, Federal Bridge Program and
INFRA Grant
Project Name Eckert Rd Bridge #2147 & #2148
Project
Description Reconstruct the existing deficient bridges over the
Boise River and Ridenbaugh Canal
Cost $5.0M
Local Match $0.37M to $1.0M
Possible
Funding RAISE, Federal Bridge Program and
INFRA Grant
Project Name Replace Bridges That Create Flood Hazards
Project
Description Reconstruct obsolete bridge with design that eliminates
100-year flooding hazard created by existing bridge
Cost $0.5M to $2.0M
Local Match $0.12M to $0.5M
Possible
Funding FEMA, Building Resilient
Infrastructure and Communities (BRIC)
Project Name Replace Non-compliant Curb Ramps at Joint ACHD-ITD Intersections
Project
Description Bring non-compliant curb cuts up to ADA standards where
ACHD sidewalks intersect ITD routes
Cost $0.6M
Local Match $0.00
Possible
Funding Idaho Americans with Disabilities
Act Curb Ramp Program
Project Name Avalon St and Kay St
Project
Description To improve safety at intersection, add signals, enhanced
pedestrian facilities and intersection lighting.
Cost $0.6M
Local Match $0.04M
Possible
Funding Local Highway Safety Improvement
Program (LHSIP)
Project Name Bike Lane Gap - Americana and 15th Street
Project
Description To improve safety, at intersection of 15th Street, widen
Americana Boulevard roadway to the north to accommodate for consistent 5’ bike
lanes
Cost $0.3M
Local Match $22K
Possible
Funding LHSIP
Project Name Five Mile Rd, Overland Rd / Franklin Rd
Project
Description Working with ITD, reconstruct the existing bridge over
Interstate 84 and widen adjacent legs of Five Mile Rd to five lanes
Cost $22.5M
Local Match $4.5M, less ITD’s portion for
overpass construction
Possible
Funding RAISE Grant
Project Name NEPA Study
Project Description NEPA study for a future bridge or road improvement project.
May be in coordination with an ACHD partner.
Cost $0.25M to $2M
Local Match $50K to $0.4M or half of match
Possible
Funding RAISE Grant
Project Name ACHD Urban Improvement Project
Project
Description Construct a Single-Lane Roundabout on Floating Feather
Rd, in the City of Star
Cost $1.0M to $1.5M
Local Match $70K to $0.1M
Possible
Funding STBG-Urban
Project Name ACHD Rural Improvement Project
Project
Description Reconstruct two lane, four mile long segment of Poen
Road, from Swan Falls Road to Cloverdale Road, which was not built to modern
standards Estimated cost is $6,300,000
Cost $1.0M
Local Match $70K to $0.1M match
Possible
Funding STBG-Rural or State Program like Local
Strategic Initiatives Grant
Project Name ACHD Rural Improvement Project
Project
Description Improve safety and freight movement along Kuna-Mora Rd
by adding paved shoulders on turns of three-mile segment, just west of I-84
interchange.
Cost $1.0M
Local Match $70K to $0.1M match
Possible
Funding STBG-Rural or State Program like
Local Strategic Initiatives Grant
Project Name ACHD Rail Safety Project
Project
Description Apply through ITD for funding to eliminate hazards and
improve rail crossing safety at rail crossings on ACHD’s network
Cost $0.2M to $0.5M
Local Match No required match
Possible
Funding Federal Railway-Highway Crossings
Program
Project Name ACHD Enhanced Improvement Project
Project
Description Apply for State funding to offset cost of scheduled
roadway improvement project
Cost Two grants up to $1.0M each
Local Match No required match
Possible
Funding State Program like Local Strategic
Initiatives Grant
Arterial roadways, with their higher traffic volumes require added consideration to safely accommodate bikes and pedestrians. These Primary Focus projects will install as appropriate, low-stress bike route alternatives, enhanced pedestrian crossings on arterial roadways, and fill sidewalk gaps. Enhanced crossings include Accessible Pedestrian Signals (APS), Pedestrian Hybrid Beacon (PHB) and Rectangular Rapid Flashing Beacon (RRFB).
Project Name Desert Ave, Latigo Dr to Cole Road
Project
Description Construct enhanced pedestrian facilities
Cost $0.5M
Local Match $39K
Possible
Funding Transportation Alternatives
Program (TAP)
Project Name Executive St from President Dr to Five Mile Rd
Project
Description Fill sidewalk gaps on both sides
Cost $0.4M
Local Match $30K
Possible
Funding Transportation Alternatives
Program (TAP)
Project Name Locust Grove Rd and Woodbridge Dr Pedestrian Crossing
Project
Description Install PHB
Cost $0.2M
Local Match $14K
Possible
Funding Transportation Alternatives
Program (TAP)
Project Name Park Creek Dr and Deer Creek Ln
Project
Description Construct enhanced pedestrian facilities and upgrade ADA
ramps
Cost $0.1M
Local Match $11K
Possible
Funding Transportation Alternatives
Program (TAP)
In response to existing and anticipated air quality and stormwater requirements, staff will seek grant funding that enables the District to implement innovative projects and training that prepares the District for broader regulatory requirements. Projects and training would focus on implementing stormwater projects that respond to lower Boise River Total Maximum Daily Load (TMDL) and NPDES permit requirements. In addition, look for opportunities to improve ACHD operations with proven green technologies.
The following is a list of additional Primary Focus projects that staff will seek outside funding:
Project Name GSI Technical Assistance Grant
Project
Description Technical assistance to develop a GSI Maintenance and
Operations plan for the operation and maintenance of ACHD’s green
infrastructure
Cost $50K
Local Match As required
Possible
Funding EPA’s Technical Assistance
Services for Communities program
Project Name GSI Infrastructure Supportive Curriculum
Project
Description To increase the number of qualified contractors with
qualified staff, jointly develop with College of Western Idaho (CWI) a
certified horticulture curriculum focused on the maintenance of stormwater
facilities.
Cost $50K
Local Match Min. $4K
Possible
Funding EPA Urban Waters Small Grant
Project Name GSI Infrastructure Projects
Project
Description Fund permeable paver retrofit of alleys in downtown
Boise with cost-share from city
Cost $0.1M
Local Match As required with City cost-share
Possible
Funding Federal source
Project Name GSI Infrastructure Projects
Project
Description Fund permeable paver retrofit of alleys adjacent to
Meridian Community Center with cost-share from city
Cost $50K
Local Match As required with City cost-share
Possible
Funding Federal source
Project Name GSI Infrastructure Projects
Project
Description Fund retrofit of stormwater system in Main/Fairview
corridor with cost-share from city.
Projects may include permeable alley, bioretention planters and tree
planter
Cost $0.1M
Local Match As required with City cost-share
Possible
Funding Transportation Alternatives and
other Federal source
Project Name Replace or Upgrade Old Diesel Engines
Project
Description Replace existing construction equipment’s diesel motor
with new clean diesel motor.
Cost $10K to $50K
Local Match As required
Possible Funding EPA and STBG-TMA
The Strategic Plan identifies Secondary Focus project as road enhancements that improve capacity and provide congestion management and relief. Secondary Focus projects also include cooperative projects with ITD, cities and businesses that support economic growth and job creation.
The following is a list of Secondary Focus projects that staff will seek outside funding:
Project Name Joint NEPA Study and Design for Linder Road, Overland Rd / Franklin Rd
Project
Description Conduct a NEPA study, and design work, for a joint
Linder Road bridge and road improvement project. Study would evaluate
construction of a bridge over Interstate 84 and widening of adjacent legs of
Linder Rd. Any project would be in
coordination with ACH
Cost $1.5M
Local Match $0.3M less partners’ portion
Possible
Funding RAISE, INFRA grants and ARPA funds
Project Name ACHD-ITD Joint Intersections
Project
Description Partner with ITD to improve the ACHD portion of
intersections with State Highway projects
Cost $0.5M to $10M
Local Match $19K to $2M
Possible
Funding RAISE, STBG-TMA and INFRA grants
Project Name Maintaining Power in an Emergency
Project
Description Purchase necessary stand-by power systems for Adams
Street, Cloverdale Road, Franklin Road and Ustick Road facilities
Cost $0.2M
Local Match $59K
Possible
Funding Homeland Security Grant (HSGP),
State Homeland Security (SHSP), Urban Areas Security Initiative (UASIP) and
Emergency Management Performance Grants (EMPG)
Project Name Sidewalk Gaps
Project
Description Fill sidewalk gaps in existing ACHD system
Cost $0.1M
Local Match $11K
Possible
Funding TAP
Project Name Implement Regional Low-Stress Bike Routes
Project
Description Seek funding to implement Bike Master Plan projects
Cost $25K to $0.5M
Local Match $0 to $37K
Possible
Funding TAP
In 2021, ACHD will be completing its first cycle of Neighborhood Bike and Pedestrian Plans. This initial cycle helped establish a vision for build out of a bike and pedestrian network for all areas of Ada County. In the next cycle, beginning in 2022, ACHD will revisit each of the previously planned areas to report on progress and to make any updates to the planned network. This next cycle will also include a review and update of ACHD’s facility accessibility inventory as well as a safety review for each area.
- 1045 Total Identified Neighborhood Plan Projects
- 301 Complete Neighborhood Plan Projects (14 More Than Annual Report)
- 303 Programmed Neighborhood Plan Projects (158 More Than Annual Report)
Project Name Warm Springs Ave and Maynard Ave Pedestrian Crossing (Barber Valley Improvements A)
Project Type Community
DESIGN YEAR 2022
RIGHT-OF-WAY Year N/A
Construction Year 2024
Total Project Cost $111,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Warm Springs Ave and Sky Bar St Pedestrian Crossing (Barber Valley Improvements A)
Project Type Community
DESIGN YEAR 2022
RIGHT-OF-WAY Year N/A
Construction Year 2024
Total Project Cost $111,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Annett St, Malad St / Targee St (Central Bench Improvements C)
Project Type Livable Street
DESIGN YEAR 2023
RIGHT-OF-WAY Year 2024
Construction Year Future
Total Project Cost $627,000
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name Bikeway Signage (2021) - Includes Canal St Bikeway, Columbus Bikeway, and Protest-University Bikeway
Project Type Community
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2022
Total Project Cost $419,000
Improvement Type Bike Facilities
Project Name Bethel St, Orchard St / Roosevelt St
Project Type Livable Street
DESIGN YEAR Future
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $1,881,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Cassia St Bikeway and Pedestrian Improvements - Includes Five (5) Pedestrian Crossings, Two Sidewalk Segments, and New Pathway and Pedestian Bridge at Cassia Park
Project Type Livable Street
DESIGN YEAR 2018-2019
RIGHT-OF-WAY Year 2020
Construction Year 2021-2022
Total Project Cost $3,624,200
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Emerald St, Cole Rd / Raymond St (Central Bench Improvements D)
Project Type Community
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year Future
Total Project Cost $597,000
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name Fairview Ave Hill, Orchard St / Garden St
Project Type Community
DESIGN YEAR Future
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $322,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Garden St Bikeway, Cassia St / Greenbelt (Central Bench Improvements A)
Project Type Livable Street
DESIGN YEAR 2022
RIGHT-OF-WAY Year 2023
Construction Year Future
Total Project Cost $215,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Garden St, Albion St / Franklin Rd (Central Bench Improvements A)
Project Type Livable Street
DESIGN YEAR 2022
RIGHT-OF-WAY Year 2023
Construction Year Future
Total Project Cost $1,285,000
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name Garden St, Bethel St / Emerald St (Central Bench Improvements A)
Project Type Livable Street
DESIGN YEAR 2022
RIGHT-OF-WAY Year 2023
Construction Year 2025
Total Project Cost $1,460,000
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name Garden St, Franklin Rd / Bethel St
Project Type Livable Street
DESIGN YEAR 2019
RIGHT-OF-WAY Year 2022
Construction Year 2023
Total Project Cost $1,110,000
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name Irving St, Orchard St / Roosevelt St (Central Bench Improvements B)
Project Type Livable Street
DESIGN YEAR 2023
RIGHT-OF-WAY Year 2024
Construction Year Future
Total Project Cost $825,000
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name Kootenai St Traffic Calming, (All Phases) - Orchard St / Vista Ave - Includes Signal Replacement at Latah and Roosevelt and a Pedestrian Crossing at Johnson
Project Type Livable Street
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2021-2022
Construction Year 2022-2023
Total Project Cost $3,535,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Liberty St Bridge #2186, 240' N/O Franklin Rd (Liberty Corridor A)
Project Type Bridges
DESIGN YEAR 2022
RIGHT-OF-WAY Year 2023
Construction Year Future
Total Project Cost $2,238,500
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Liberty St Sidewalk and Bikeway, Douglas St / Denton St (Liberty Corridor A)
Project Type Livable Street
DESIGN YEAR 2022
RIGHT-OF-WAY Year 2022
Construction Year 2025
Total Project Cost $617,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Malad St, Annett St / Federal Way (Central Bench Improvements C)
Project Type Community
DESIGN YEAR 2023
RIGHT-OF-WAY Year 2024
Construction Year Future
Total Project Cost $859,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Malad St, Kerr St / Vista Ave (Central Bench Improvements E)
Project Type Livable Street
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $800,000
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name Nez Perce St, Orchard St / Columbus St (Central Bench Improvements C)
Project Type Community
DESIGN YEAR 2023
RIGHT-OF-WAY Year 2023
Construction Year Future
Total Project Cost $312,500
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Nez Perce St, Vista Ave / Columbus St (Central Bench Improvements E)
Project Type Community
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $465,000
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name Orchard St and Clark St (Central Bench Improvements B)
Project Type Traffic Safety & Ops
DESIGN YEAR 2023
RIGHT-OF-WAY Year 2024
Construction Year 2025
Total Project Cost $1,317,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity
Project Name Orchard St and Franklin Rd Accessible Pedestrian Signal (Central Bench Improvements A)
Project Type Traffic Safety & Ops
DESIGN YEAR 2022
RIGHT-OF-WAY Year 2023
Construction Year 2025
Total Project Cost $719,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Overland Rd and Shoshone St Intersection Access and Safety Improvements
Project Type Traffic Safety & Ops
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2022
Construction Year 2023
Total Project Cost $175,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity
Project Name Overland Rd and Vista Ave (Central Bench Improvements D)
Project Type Traffic Safety & Ops
DESIGN YEAR 2024
RIGHT-OF-WAY Year N/A
Construction Year Future
Total Project Cost $2,140,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Vehicular Capacity, Maintenance
Project Name Owyhee St, Kootenai St / Rose Hill St (Central Bench Improvements F)
Project Type Livable Street
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $1,435,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Pavement Preservation & ADA (2022) - Phase 1 - Includes Morris Hill, west end / Hartman; Spaulding, Phillippi / Orchard; Roosevelt, Emerald / Irving
Project Type Maintenance
DESIGN YEAR 2020
RIGHT-OF-WAY Year N/A
Construction Year 2022
Total Project Cost $6,404,000
Improvement Type Pedestrian Facilities, ADA Improvements,
Maintenance
Project Name Phillippi St Bridge #1366, 650' N/O Overland Rd (Central Bench Improvements B)
Project Type Bridges
DESIGN YEAR 2023
RIGHT-OF-WAY Year 2024
Construction Year 2025
Total Project Cost $389,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Phillippi St, Cassia St / Franklin Rd (Central Bench Improvements B)
Project Type Livable Street
DESIGN YEAR 2023
RIGHT-OF-WAY Year 2024
Construction Year Future
Total Project Cost $2,591,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Phillippi St, Franklin St / Emerald St (Central Bench Improvements F)
Project Type Livable Street
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $1,105,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Phillippi St, Malad St / Targee St
Project Type Livable Street
DESIGN YEAR 2016
RIGHT-OF-WAY Year 2017
Construction Year 2021-2022
Total Project Cost $568,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Phillippi St, Overland Rd / Cassia St (Central Bench Improvements D)
Project Type Livable Street
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year Future
Total Project Cost $1,665,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Phillippi St, Targee St / Overland Rd
Project Type Livable Street
DESIGN YEAR 2017
RIGHT-OF-WAY Year 2019
Construction Year 2021-2022
Total Project Cost $971,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Residential Capital Maintenance (2024) HB312 Project - Includes Cassia, Orchard / east end
Project Type Livable Street
DESIGN YEAR 2022
RIGHT-OF-WAY Year N/A
Construction Year 2024
Total Project Cost $3,753,000
Improvement Type Maintenance
Project Name Roadway and ADA Improvements (2023) Part 1 - Includes Allumbaugh, Franklin / Fairmont; and Orchard, Emerald / Chinden
Project Type Livable Street
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2022
Construction Year 2023
Total Project Cost $7,519,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Roadway and ADA Improvements (2024) - Includes Orchard, I-84 / Overland; Overland, Orchard / Vista; Pond, Targee / Hillcrest; and Vista, Overland / Rose Hill
Project Type Livable Street
DESIGN YEAR 2022
RIGHT-OF-WAY Year 2023
Construction Year 2024
Total Project Cost $9,351,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Roosevelt St, Rose Hill St / Emerald St
Project Type Livable Street
DESIGN YEAR 2016
RIGHT-OF-WAY Year N/A
Construction Year 2022
Total Project Cost $1,398,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Rose Hill St and Owyhee St (Central Bench Improvements A)
Project Type Traffic Safety & Ops
DESIGN YEAR 2021-2022
RIGHT-OF-WAY Year 2023
Construction Year 2024
Total Project Cost $492,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity
Project Name Rose Hill St Temporary Traffic Calming, Roosevelt St / Vista Ave (Central Bench Improvements A)
Project Type Community
DESIGN YEAR Future (Concept in 2022)
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost TBD
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity
Project Name Victory Rd, Virginia Ave/ E/O UPRR (Central Bench Improvements F)
Project Type Community
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $865,000
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name Vista Ave and Nez Perce St Pedestrian Crossing
Project Type Community
DESIGN YEAR 2020
RIGHT-OF-WAY Year 2020
Construction Year 2021
Total Project Cost $288,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name 05th St and 06th St, Myrtle St / Fort St, Two-Way Conversion
Project Type Community
DESIGN YEAR 2018-2019
RIGHT-OF-WAY Year N/A
Construction Year 2024-2025
Total Project Cost $3,055,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name 08th St Bike Facility, Washington St / Union St
Project Type Community
DESIGN YEAR 2023
RIGHT-OF-WAY Year 2024
Construction Year Future
Total Project Cost $177,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name 11th St Bridge #1493, 90' N/O Main St
Project Type Bridges
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2021
Construction Year 2022
Total Project Cost $357,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Bannock St Bikeway (West Phase), Whitewater Park Blvd / Ave C (Downtown/East End Improvements A)
Project Type Community
DESIGN YEAR 2025 (Concept in 2023)
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $257,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Downtown Boise Implementation (2019) HB312 Project (CCDC) - Includes Bannock and 08th St Maintenance
Project Type Maintenance
DESIGN YEAR 2018
RIGHT-OF-WAY Year N/A
Construction Year 2022-2023
Total Project Cost $1,853,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Downtown Boise Implementation (2020) HB312 Project - Includes State St, 16th / 01st (Maintenance, Streetscape, Signal Modifications, and 12th and 14th Pedestrian Crossings
Project Type Maintenance
DESIGN YEAR 2020-2021
RIGHT-OF-WAY Year 2020
Construction Year 2022-2023
Total Project Cost $12,402,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Roadway and ADA Improvements (2023) Part 3 - Includes Microseal of 15th, Front / State; 16th, Front / State; Bannock, 16th / 02nd; and Idaho, 16th / Broadway
Project Type Maintenance
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2022
Construction Year 2023
Total Project Cost $380,000
Improvement Type ADA Improvements, Maintenance
Project Name Roadway and ADA Improvements (2024) - Includes Americana, Ann Morrison Park / Shoreline; and Shoreline, Americana / Fairview
Project Type Livable Street
DESIGN YEAR 2022
RIGHT-OF-WAY Year 2023
Construction Year 2024
Total Project Cost $9,351,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Warm Springs Ave, Broadway Ave / Windsong Dr (Downtown/East End Improvements C)
Project Type Community
DESIGN YEAR Future
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost TBD
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name 05th St and Fort St and Hays St
Project Type Community
DESIGN YEAR Future
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $175,000 (Concept Only)
Improvement Type Pedestrian Facilities, ADA Improvements,
Bike Facilities, Vehicular Capacity, Maintenance
Project Name Bannock St Maintenance and Bikeway, Broadway Ave / Greenbelt (Downtown/East End Improvements A)
Project Type Livable Street
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year 2026
Total Project Cost $720,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Broadway Ave/Avenue B and Idaho St/Warm Springs Ave (Downtown/East End Improvements B)
Project Type Community
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $3,992,500
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Coston St, Bannock St / Franklin St
Project Type Community
DESIGN YEAR 2022
RIGHT-OF-WAY Year 2023
Construction Year Future
Total Project Cost $318,000
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name Flume St and Bannock St Pedestrian Improvement (Downtown/East End Improvements A)
Project Type Community
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $126,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Franklin St Bikeway, Resseguie St / Bannock St (North Boise Improvements A)
Project Type Livable Street
DESIGN YEAR 2024 (Concept in 2022)
RIGHT-OF-WAY Year 2025
Construction Year 2026
Total Project Cost $254,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Residential Capital Maintenance (2024) HB312 Project - Includes Bacon, Warm Springs / Hillview; Brookdale, Hillview / Hot Springs; Hillview, Coston / Hot Springs; Hot Springs, Warm Springs / Bacon; Louisa, Warm Springs / Bacon; and Riverview, Brookdale /
Project Type Livable Street
DESIGN YEAR 2022
RIGHT-OF-WAY Year N/A
Construction Year 2024
Total Project Cost $3,753,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Maintenance
Project Name St. Luke's Master Plan Transportation Component Implementation (2022)
Project Type Cooperative
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2022
Total Project Cost $1,406,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name St. Luke's Master Plan Transportation Component Implementation (2023)
Project Type Cooperative
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2023
Total Project Cost $1,406,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name St. Luke's Master Plan Transportation Component Implementation (2024)
Project Type Cooperative
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2024
Total Project Cost $1,406,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name St. Luke's Master Plan Transportation Component Implementation (2025)
Project Type Cooperative
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2025
Total Project Cost $1,406,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Warm Springs Ave and Straughan Ave Pedestrian Crossing (Downtown/East End Improvements A)
Project Type Community
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $196,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name 05th St and Fort St and Hays St
Project Type Community
DESIGN YEAR Future
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $175,000 (Concept Only)
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name 08th St Bike Facility, Washington St / Union St
Project Type Livable Street
DESIGN YEAR 2023
RIGHT-OF-WAY Year 2024
Construction Year Future
Total Project Cost $177,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name 09th St and Washington St Pedestrian Crossing (North Boise Improvements A)
Project Type Community
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2024
Construction Year Future
Total Project Cost $190,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name 11th St Maintenance and Bikeway, State St / Heron St - Includes Fort St and 11th St and Hays St at 11th St and 12th St Pedestrian Crossings and Roadway Maintenance
Project Type Livable Street
DESIGN YEAR 2020-2021
RIGHT-OF-WAY Year N/A
Construction Year 2022-2023
Total Project Cost $2,139,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name 13th St and Franklin St Pedestrian Crossing (North Boise Improvements A)
Project Type Community
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year Future
Total Project Cost $332,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name 13th St Traffic Calming (Phase 1), Fort St / Hill Rd - Includes Resseguie St Pedestrian Crossing
Project Type Livable Street
DESIGN YEAR 2020-2021
RIGHT-OF-WAY Year N/A
Construction Year 2021-2022
Total Project Cost $1,468,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name 16th St Bridge #1484, 150' N/O Washington St (North Boise Improvements A)
Project Type Bridges
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2024
Construction Year Future
Total Project Cost $448,000
Improvement Type Maintenance
Project Name 16th St, Dewey St / Hill Rd (North Boise Improvements B)
Project Type Community
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $104,000
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name 24th St Road and Bridge Projects - Includes 24th St Sidewalk and Bridges #1467 (24th), #1468 (Bella), and #1466 (Irene)
Project Type Bridges
DESIGN YEAR 2019
RIGHT-OF-WAY Year 2020
Construction Year 2022
Total Project Cost $1,289,800
Improvement Type Pedestrian Facilities, ADA
Improvements, Maintenance
Project Name 26th St Bridge #1321, 160' S/O Hill Rd
Project Type Bridges
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2022
Construction Year 2023
Total Project Cost $411,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Maintenance
Project Name 38th St, Bush Ave / Sunset Ave
Project Type Livable Street
DESIGN YEAR 2019-2020
RIGHT-OF-WAY Year 2020
Construction Year 2021-2022
Total Project Cost $545,200
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Ada St and 05th St (North Boise Improvements A)
Project Type Community
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $95,000
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name Bannock St Bikeway (West Phase), Whitewater Park Blvd / Ave C (Downtown/East End Improvements A)
Project Type Livable Street
DESIGN YEAR 2025 (Concept in 2023)
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $257,000
Improvement Type Pedestrian Facilities, ADA Improvements,
Bike Facilities, Vehicular Capacity
Project Name Bikeway Signage (2021) - Includes 18th St Bikeway, 23rd St Bikeway, Breneman St Bikeway, Ellis-Resseguie Bikeway, Main-Fairview Bikeway, and Pleasanton Ave Bikeway
Project Type Community
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2022
Total Project Cost $419,000
Improvement Type Bike Facilities
Project Name Boise Hills Dr, 07th St
/ Mesa Grande Ln (North Boise Improvements D)
Project Type Community
DESIGN YEAR Future
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost TBD
Improvement Type Pedestrian Facilities, ADA Improvements
Project Name Fairview Ave Bridge #2196 and #2197, Boise River
Project Type Bridges
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $8,397,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Fairview Ave Hill, Orchard St / Garden St
Project Type Community
DESIGN YEAR Future
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $332,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Franklin St Bikeway, Resseguie St / Reserve St (North Boise Improvements A)
Project Type Livable Street
DESIGN YEAR 2024 (Concept in 2022)
RIGHT-OF-WAY Year 2025
Construction Year 2026
Total Project Cost $254,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Green Stormwater Implementation (2024) - Includes 13th, Alturas / Eastman
Project Type Environmental
DESIGN YEAR 2023
RIGHT-OF-WAY Year N/A
Construction Year 2024
Total Project Cost $500,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Maintenance
Project Name Harrison Blvd and Irene St Pedestrian Crossing (North Boise Improvements A)
Project Type Community
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year Future
Total Project Cost $437,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Irene St, 32nd St / 28th St (North Boise Improvements A)
Project Type Livable Street
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year Future
Total Project Cost $488,000
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name Jefferson St and 29th St (North Boise Improvements C)
Project Type Community
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $147,000
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name Longfellow Elementary Attendance Area Pedestrian Improvements (North Boise Improvements A)
Project Type Community
DESIGN YEAR 2024
RIGHT-OF-WAY Year N/A
Construction Year 2025
Total Project Cost $637,000
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name Parkhill Dr Bridge #1383, 200' W/O 15th St (North Boise Improvements A)
Project Type Bridges
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year Future
Total Project Cost $478,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Maintenance
Project Name Pavement Preservation & ADA (2022) - Phase 1 - Includes 20th, Lemp / Irene; and 26th, State / Heron
Project Type Maintenance
DESIGN YEAR 2020
RIGHT-OF-WAY Year N/A
Construction Year 2022
Total Project Cost $6,404,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Maintenance
Project Name Pavement Preservation & ADA (2022) - Phase 3 - Includes Fort, 16th / 15th; and Resseguie, 16th / 10th
Project Type Maintenance
DESIGN YEAR 2022
RIGHT-OF-WAY Year N/A
Construction Year 2022
Total Project Cost $368,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Maintenance
Project Name Residential Capital Maintenance (2024) HB312 Project - Includes 09th, Fort / north end
Project Type Livable Street
DESIGN YEAR 2022
RIGHT-OF-WAY Year N/A
Construction Year 2024
Total Project Cost $3,753,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name State St and 21st St Pedestrian Crossing (North Boise Improvements B)
Project Type Community
DESIGN YEAR 2023
RIGHT-OF-WAY Year 2024
Construction Year Future
Total Project Cost $248,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name State St, 36th St / 27th St
Project Type Livable Street
DESIGN YEAR Future
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $5,574,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name State St, Collister Dr / 36th St
Project Type Livable Street
DESIGN YEAR Future
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $13,220,000
Improvement Type Pedestrian Facilities, ADA Improvements,
Bike Facilities, Vehicular Capacity, Maintenance
Project Name Sunset Ave, 36th St / Hill Rd (North Boise Improvements B)
Project Type Livable Street
DESIGN YEAR 2026 (Concept in 2024)
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $2,384,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Taft St, Sycamore Dr / 36th St (Northwest Boise Improvements A)
Project Type Livable Street
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year 2026
Total Project Cost $2,165,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Whitewater Park Blvd Basin #1009
Project Type Environmental
DESIGN YEAR 2020-2021
RIGHT-OF-WAY Year N/A
Construction Year Future
Total Project Cost $310,000
Improvement Type Maintenance
Project Name Bikeway Signage (2021) - Includes Bloom St Bikeway and Northwest Boise Bikeway
Project Type Community
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2022
Total Project Cost $419,000
Improvement Type Bike Facilities
Project Name Bogart Ln Bridge #1041, 25' N/O SH 44 (State St)
Project Type Bridges
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $416,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Bogart Ln, SH 44 (State St) / Sloan St - Includes Sloan Pedestrian Crossing
Project Type Livable Street
DESIGN YEAR 2019-2020
RIGHT-OF-WAY Year 2020
Construction Year 2021-2022
Total Project Cost $375,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Carlsbad Way Bridge #1419, 500' N/O State St (2022 Bridges)
Project Type Bridges
DESIGN YEAR 2022
RIGHT-OF-WAY Year 2023
Construction Year 2026
Total Project Cost $292,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Maintenance
Project Name Caswell St, Bogart Ln / Roe St (Northwest Boise Improvements A)
Project Type Community
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year Future
Total Project Cost $300,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Crewe Ave Bridge #1046, 300' S/O Devonwood Dr (Northwest Boise Improvements A)
Project Type Bridges
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year Future
Total Project Cost $454,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Maintenance
Project Name Hill Rd, Castle Dr / Outlook Ave (Northwest Boise Improvements A) - Includes Castle and Cynthia Mann Pedestrian Crossing
Project Type Livable Street
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year 2026
Total Project Cost $597,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Horseshoe Bend Rd, State St / Hill Rd - Includes Utahna Pedestrian Crossing
Project Type Community
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2022
Construction Year 2025
Total Project Cost $1,064,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Pavement Preservation & ADA (2022) - Phase 1 - Includes Bluegrass, Ellens Ferry / Castle; Castle Hills, Castle / Drawbridge; Drawbridge, west end / Castle Hills; and Turret, Drawbridge / Castle
Project Type Maintenance
DESIGN YEAR 2020
RIGHT-OF-WAY Year N/A
Construction Year 2022
Total Project Cost $6,404,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Maintenance
Project Name Pavement Preservation & ADA (2022) - Phase 2 - Includes Collister, Quail Ridge / north end
Project Type Maintenance
DESIGN YEAR 2020
RIGHT-OF-WAY Year N/A
Construction Year 2022
Total Project Cost $2,628,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Maintenance
Project Name Pierce Park Ln Bridge #2029, at Hill Rd
Project Type Bridges
DESIGN YEAR 2023
RIGHT-OF-WAY Year 2024
Construction Year Future
Total Project Cost $4,810,000
Improvement Type Pedestrian Facilities, ADA Improvements,
Bike Facilities, Vehicular Capacity, Maintenance
Project Name Pierce Park Ln, Castle Dr / Hill Rd (Northwest Boise Improvements A)
Project Type Livable Street
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year Future
Total Project Cost $1,642,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Roe St, Limelight St / Caswell St (Northwest Boise Improvements A)
Project Type Livable Street
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year 2026
Total Project Cost $119,000
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name Safe Sidewalk Program (2022)
Project Type Community
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2022
Total Project Cost $1,600,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Maintenance
Project Name State St and Glenwood St
Project Type Intersection
DESIGN YEAR Future
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $17,200,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name State St and Pierce Park Ln - Includes State St widening from Hertford to Ellens Ferry
Project Type Livable Street
DESIGN YEAR 2018-2022
RIGHT-OF-WAY Year 2022-2023
Construction Year 2025
Total Project Cost $11,645,238
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name State St, Collister Dr / 36th St
Project Type Livable Street
DESIGN YEAR Future
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $13,220,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name State St, Pierce Park Ln / Collister Dr
Project Type Livable Street
DESIGN YEAR Future
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $7,682,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Taft St, Sycamore Dr / 36th St (Northwest Boise Improvements A)
Project Type Livable Street
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year 2026
Total Project Cost $2,165,000
Improvement Type Pedestrian Facilities, ADA Improvements,
Bike Facilities
Project Name Bergeson St Traffic Calming, Federal Way / Holcomb Rd (Southeast Boise Improvements B)
Project Type Community
DESIGN YEAR Future (Concept in FY23)
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost TBD
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Bikeway Signage (2021) - Includes Protest-University Bikeway
Project Type Community
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2022
Total Project Cost $419,000
Improvement Type Bike Facilities
Project Name Bikeway Signage (2026) - Includes Manitou Ave Bikeway
Project Type Community
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2026
Total Project Cost $250,000
Improvement Type Bike Facilities
Project Name Boise Ave and Linden St Pedestrian Crossing (Southeast Boise Improvements B)
Project Type Community
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $167,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Capitol Blvd, Vista Ave / Greenbelt
Project Type Livable Street
DESIGN YEAR 2025 (Concept in 2022)
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $2,275,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Columbia Village Bikeway, Hwy 21 / Boise Ave (Southeast Boise Improvements A)
Project Type Community
DESIGN YEAR 2023
RIGHT-OF-WAY Year 2023
Construction Year Future
Total Project Cost $280,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Eckert Rd Bridge #2147 and #2148, Boise River / Ridenbaugh Canal
Project Type Bridges
DESIGN YEAR Future
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $250,000 (Concept only)
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Fairview Ave Hill, Orchard St / Garden St
Project Type Community
DESIGN YEAR Future
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $332,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Federal Way and Malad St/Targee St (Southeast Boise Improvements C)
Project Type Intersection
DESIGN YEAR Future
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost TBD
Improvement Type Pedestrian Facilities, ADA
Improvements, Vehicular Capacity
Project Name Federal Way Maintenance Yard
Project Type Miscellaneous
DESIGN YEAR 2025
RIGHT-OF-WAY Year N/A
Construction Year 2026-2030
Total Project Cost $24,400,000
Improvement Type Maintenance
Project Name Gowen Rd Bridge #2110, W/O I-84
Project Type Bridges
DESIGN YEAR 2019-2020
RIGHT-OF-WAY Year 2020
Construction Year 2022
Total Project Cost $9,889,500
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Linden St, Broadway Ave / Boise Ave (Southeast Boise Improvements C)
Project Type Community
DESIGN YEAR Future
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost TBD
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Mallard Ave Bridge #1339, 650' W/O Parkcenter Blvd
Project Type Bridges
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2022
Construction Year 2024
Total Project Cost $878,000
Improvement Type Maintenance
Project Name Roadway and ADA Improvements (2024) - Includes Americana, Ann Morrison Park / Shoreline; Grand Forest, Gowen / Rock Rose; and Lake Forest, Federal / Summersweet
Project Type Livable Street
DESIGN YEAR 2022
RIGHT-OF-WAY Year 2023
Construction Year 2024
Total Project Cost $9,351,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Woodvine St, Gekeler Ln / Boise Ave (Southeast Boise Improvements B)
Project Type Community
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $850,000
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name Amity Rd and Cloverdale Rd Roundabout (Cloverdale Corridor A)
Project Type Intersection
DESIGN YEAR 2023
RIGHT-OF-WAY Year 2024-2025
Construction Year 2026
Total Project Cost $5,363,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Amity Rd and Five Mile Rd (Amity Corridor A)
Project Type Intersection
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $4,301,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Amity Rd and Maple Grove Rd - Includes Bridge #1243
Project Type Bridges
DESIGN YEAR 2022
RIGHT-OF-WAY Year 2023
Construction Year 2024-2025
Total Project Cost $652,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Amity Rd, Cloverdale Rd / Five Mile Rd (Amity Corridor B) - Includes Valley Pedestrian Crossing
Project Type Livable Street
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year 2026
Total Project Cost $8,650,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Amity Rd, Eagle Rd / Cloverdale Rd (Amity Corridor B)
Project Type Livable Street
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $5,106,700
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Amity Rd, Five Mile Rd / Maple Grove Rd (Amity Corridor A)
Project Type Livable Street
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $4,877,900
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Amity Rd, Locust Grove Rd / Eagle Rd (Amity Corridor B)
Project Type Livable Street
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $5,018,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Cloverdale Rd, Amity Rd / Victory Rd (Cloverdale Corridor B) - Includes Bridge #1219 and Reutzel Pedestrian Crossing
Project Type Livable Street
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2022-2026
Construction Year Future
Total Project Cost $9,846,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Cloverdale Rd, Lake Hazel Rd / Amity Rd (Cloverdale Corridor C)
Project Type Livable Street
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026-2027
Construction Year Future
Total Project Cost $5,499,500
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Cloverdale Rd, Victory Rd / Overland Rd - Includes Muir Ridge Pedestrian Crossing
Project Type Livable Street
DESIGN YEAR 2022
RIGHT-OF-WAY Year 2023-2024
Construction Year 2026
Total Project Cost $8,336,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Cloverdale-Five Mile Bikeway, Columbia Rd / Camas St (Southwest Boise Improvements B)
Project Type Community
DESIGN YEAR 2025
RIGHT-OF-WAY Year N/A
Construction Year Future
Total Project Cost $265,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Colt Dr and Silver Spur St Pedestrian Crossing (Southwest Boise Improvements B)
Project Type Community
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $147,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Desert Ave, Latigo Dr / Cole Rd (Southwest Boise Improvements A)
Project Type Livable Street
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year Future
Total Project Cost $528,000
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name Five Mile Rd and La Grange St Pedestrian Crossing
Project Type Community
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2021
Construction Year 2022
Total Project Cost $545,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Five Mile Rd, Overland Rd / Franklin Rd (Five Mile Corridor A)
Project Type Livable Street
DESIGN YEAR 2023- 2024
RIGHT-OF-WAY Year 2025- 2026
Construction Year Future
Total Project Cost $22,391,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Hollandale-Targee Bikeway, Locust Grove Rd / Entertainment Ave (Southwest Boise Improvements A)
Project Type Community
DESIGN YEAR 2024 (Concept in 2022)
RIGHT-OF-WAY Year 2025
Construction Year Future
Total Project Cost $438,000
Improvement Type Bike Facilities
Project Name Lake Hazel Middle School Pedestrian Improvements (Southwest Boise Improvements C)
Project Type Community
DESIGN YEAR Future
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost TBD
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Lake Hazel Rd and Cloverdale Rd
Project Type Intersection
DESIGN YEAR 2022
RIGHT-OF-WAY Year 2023-2024
Construction Year 2026
Total Project Cost $5,598,500
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Lake Hazel Rd and Five Mile Rd (Lake Hazel Corridor B)
Project Type Intersection
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2024-2025
Construction Year Future
Total Project Cost $3,149,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Lake Hazel Rd and Maple Grove Rd
Project Type Intersection
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2022
Construction Year 2024
Total Project Cost $5,217,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Lake Hazel Rd, Cloverdale Rd / Five Mile Rd
Project Type Livable Street
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2022-2023
Construction Year Future
Total Project Cost $6,762,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Lake Hazel Rd, Eagle Rd / Cloverdale Rd (Lake Hazel Corridor A)
Project Type Livable Street
DESIGN YEAR 2022
RIGHT-OF-WAY Year 2023
Construction Year 2026
Total Project Cost $6,656,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Lake Hazel Rd, Five Mile Rd / Maple Grove Rd (Lake Hazel Corridor B)
Project Type Livable Street
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year Future
Total Project Cost $6,160,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Lake Hazel Rd, Maple Grove Rd / Cole Rd (Lake Hazel Corridor C)
Project Type Livable Street
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $4,061,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Maple Grove Rd, Amity Rd / Victory Rd - Includes Bridge #1239 and Wright and Bienapfl Pedestrian Crossings
Project Type Livable Street
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2023-2024
Construction Year Future
Total Project Cost $10,533,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Maple Grove Rd, Lake Hazel Rd / Amity Rd (Southwest Boise Improvements A)
Project Type Livable Street
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026- 2027
Construction Year Future
Total Project Cost $10,397,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Mitchell St and Arabian St Terminus Improvements (Southwest Boise Improvements C)
Project Type Community
DESIGN YEAR Future
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost TBD
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Orchard St Realignment, Gowen Rd / Victory Rd - Includes Gowen and Orchard intersection (New and Old), Gowan and Dorman intersection, and Gowen and Diamond intersection
Project Type Livable Street
DESIGN YEAR 2019-2021
RIGHT-OF-WAY Year 2022-2023
Construction Year 2026- 2027
Total Project Cost $24,137,500
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Residential Capital Maintenance (2023) HB312 Project Part 2 - Includes Badger, N/O Colt; Chaps, N/O Colt; Colt, south end / north end; Coyote, N/O Colt; Ironwood, Trestlewood / Lockwood; Latigo, Desert / Colt; Lockwood, Five Mile / Ironwood; Maverick, Rem
Project Type Livable Street
DESIGN YEAR 2021
RIGHT-OF-WAY Year N/A
Construction Year 2023
Total Project Cost $3,263,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Maintenance
Project Name Residential Capital Maintenance (2024) HB312 Project - Includes Maple Grove, south end / Tarp
Project Type Livable Street
DESIGN YEAR 2022
RIGHT-OF-WAY Year N/A
Construction Year 2024
Total Project Cost $3,753,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Reutzel Dr Bridge #1249, 165' W/O Summerset Way
Project Type Bridges
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2022
Construction Year 2024
Total Project Cost $617,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Maintenance
Project Name Seabreeze Way and Mossywood Dr Pedestrian Crossing (Southwest Boise Improvements B)
Project Type Community
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $237,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Valley Heights Dr and Paris Lateral (Southwest Boise Improvements B)
Project Type Community
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $85,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Maintenance
Project Name Victory Rd and Cloverdale Rd (Cloverdale Corridor A)
Project Type Intersection
DESIGN YEAR 2023
RIGHT-OF-WAY Year 2024-2025
Construction Year 2026
Total Project Cost $7,188,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Victory Rd and Five Mile Rd (Victory Corridor D)
Project Type Intersection
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $3,650,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Victory Rd, Cloverdale Rd / Five Mile Rd (Victory Corridor A) - Includes Bridge #1276 and Canonero Way Pedestrian Crossing)
Project Type Livable Street
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year Future
Total Project Cost $5,244,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Victory Rd, Eagle Rd / Cloverdale Rd (Victory Corridor B)
Project Type Livable Street
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $3,990,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Victory Rd, Five Mile Rd / Maple Grove Rd (Victory Corridor E)
Project Type Livable Street
DESIGN YEAR Future
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $4,489,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Victory Rd, Maple Grove Rd / Cole Rd (Victory Corridor E)
Project Type Livable Street
DESIGN YEAR Future
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $2,832,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Allumbaugh St, Fairview Ave / Northview St (West Bench Improvements C)
Project Type Livable Street
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $917,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Maintenance
Project Name Benjamin Ln and BVRR Crossing Improvement
Project Type Traffic Safety & Ops
DESIGN YEAR 2021
RIGHT-OF-WAY Year N/A
Construction Year 2022
Total Project Cost $320,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Maintenance
Project Name Benjamin Ln, Westpark St / Emerald St (West Bench Improvements D)
Project Type Livable Street
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $409,000
Improvement Type Pedestrian Facilities, ADA Improvements,
Bike Facilities
Project Name Bikeway Signage (2024) - Includes Granger Ave Bikeway, McMillan-Ustick Bikeway (Phase 1 & 2)
Project Type Community
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2024
Total Project Cost $200,000
Improvement Type Bike Facilities
Project Name Bikeway Signage (2025) - Includes Cloverdale Rd Bikeway
Project Type Community
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2025
Total Project Cost $250,000
Improvement Type Bike Facilities
Project Name Bryson Ave Bridge #1134, 750' N/O Fairview Ave
Project Type Bridges
DESIGN YEAR 2020
RIGHT-OF-WAY Year 2021
Construction Year 2023
Total Project Cost $260,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Christine St, Northview St / Ustick Rd
Project Type Livable Street
DESIGN YEAR 2017
RIGHT-OF-WAY Year 2018
Construction Year 2022
Total Project Cost $1,871,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Maintenance
Project Name Clement St, Cabarton Ln / Mountain View Dr (West Bench Improvements B)
Project Type Community
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year 2026
Total Project Cost $351,000
Improvement Type Pedestrian Facilities, ADA Improvements
Project Name Cory Ln, Mitchell St / Maple Grove Rd
Project Type Livable Street
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2022
Construction Year 2023
Total Project Cost $832,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Emerald St, Benjamin Ln / Milwaukee (West Bench Improvements D)
Project Type Livable Street
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $63,000
Improvement Type Pedestrian Facilities, ADA Improvements
Project Name Emerald St, Rifleman / Cole Rd Pedestrian Facilities (West Bench Improvements D)
Project Type Livable Street
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $120,000
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name Fairview Ave and Orchard St
Project Type Traffic Safety & Ops
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2021
Construction Year 2022
Total Project Cost $521,000
Improvement Type Pedestrian Facilities, ADA Improvements
Project Name Fairview Ave, Curtis Rd / Orchard St (West Bench Improvements C)
Project Type Livable Street
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $505,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Fiddler Dr Bridge #1510, 130' W/O Arlen Dr
Project Type Bridges
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2022
Construction Year 2024
Total Project Cost $397,000
Improvement Type Maintenance
Project Name Five Mile Rd, Overland Rd / Franklin Rd (Five Mile Corridor A)
Project Type Livable Street
DESIGN YEAR 2023- 2024
RIGHT-OF-WAY Year 2025-2026
Construction Year Future
Total Project Cost $22,391,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Franklin Traffic Operations Yard
Project Type Miscellaneous
DESIGN YEAR 2021-2022
RIGHT-OF-WAY Year N/A
Construction Year 2022-2025
Total Project Cost $12,322,000
Improvement Type Maintenance
Project Name Glenwood St, Goddard Rd / US 20/26 (Chinden Blvd) (West Bench Improvements A)
Project Type Livable Street
DESIGN YEAR 2023
RIGHT-OF-WAY Year 2024
Construction Year Future
Total Project Cost $762,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Irving St, Mitchell St / Kimball St (West Bench Improvements D)
Project Type Community
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $332,000
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name Lena Ave Bridge #1509, 125' N/O Hickory Dr
Project Type Bridges
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2022
Construction Year 2023
Total Project Cost $108,000
Improvement Type Maintenance
Project Name Liberty St, Fairview Ave / Northview Ave (West Bench Improvements F)
Project Type Community
DESIGN YEAR Future
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost TBD
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Linda Vista Ln, Cory Ln / Ustick Rd (West Bench Improvements B)
Project Type Livable Street
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year Future
Total Project Cost $595,000
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name Maple Grove Rd and Edna St Pedestrian Crossing (West Bench Improvements B)
Project Type Community
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year Future
Total Project Cost $245,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Milwaukee St, Marcum St / Ustick Rd (West Bench Improvements A)
Project Type Livable Street
DESIGN YEAR 2023
RIGHT-OF-WAY Year 2024
Construction Year 2026
Total Project Cost $1,167,000
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name Mountain View Dr, Cole Rd / Glenwood St (West Bench Improvements F)
Project Type Community
DESIGN YEAR Future
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost TBD
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name Mountain View Dr-Mitchell St, Sunderland Dr / Maple Grove Rd (West Bench Improvements D)
Project Type Community
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year 2026
Total Project Cost $764,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Northview St, Maple Grove Rd / Curtis Rd (West Bench Improvements E)
Project Type Livable Street
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $950,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Pavement Preservation & ADA (2022) - Phase 1 - Includes Maple Grove, I-84 / Franklin
Project Type Maintenance
DESIGN YEAR 2020
RIGHT-OF-WAY Year N/A
Construction Year 2022
Total Project Cost $6,404,000
Improvement Type ADA Improvements, Maintenance
Project Name Poplar St Bikeway, Milwaukee St / Orchard St (West Bench Improvements C)
Project Type Community
DESIGN YEAR 2025 (Concept in 2022)
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $285,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Residential Capital Maintenance (2023) HB312 Project Part 2 - Includes Cruser, W/O Five Mile
Project Type Livable Street
DESIGN YEAR 2021
RIGHT-OF-WAY Year N/A
Construction Year 2023
Total Project Cost $3,263,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Roadway and ADA Improvements (2023) Part 1 - Includes Cole, Ustick / Mountain View; Goldenrod, west end / Cloverdale; and Orchard, Emerald / Chinden
Project Type Livable Street
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2022
Construction Year 2023
Total Project Cost $7,519,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Roadway and ADA Improvements (2024) - Includes Wainwright, Eagle / Borego
Project Type Livable Street
DESIGN YEAR 2022
RIGHT-OF-WAY Year 2023
Construction Year 2024
Total Project Cost $9,351,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Maintenance
Project Name Safe Sidewalk Program (2023)
Project Type Community
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2023
Total Project Cost $1,600,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Maintenance
Project Name Safe Sidewalk Program (2024)
Project Type Community
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2024
Total Project Cost $1,600,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Maintenance
Project Name Shoup Ave Bridge #1404, 0.25 miles W/O Maple Grove Rd
Project Type Bridges
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2022
Construction Year 2023
Total Project Cost $392,000
Improvement Type Maintenance
Project Name Ustick-Northview Bikeway Connection, Shamrock Ave / Milwaukee St (West Bench Improvements C)
Project Type Community
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $442,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Wildwood St Bridge #1425, 0.1 miles N/O Fairview Ave
Project Type Bridges
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2022
Construction Year 2025
Total Project Cost $434,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Maintenance
Project Name Wildwood St, Fairview Ave / Ustick Rd (West Bench Improvements E)
Project Type Livable Street
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $2,102,000
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name Aikens St, Eagle Rd / 02nd St
Project Type Livable Street
DESIGN YEAR 2018-2019
RIGHT-OF-WAY Year 2022
Construction Year 2024
Total Project Cost $2,763,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity
Project Name Bikeway Signage (2025) - Includes Edgewood Bikeway, Hill Rd Bikeway (Part 1), Ranch Dr Bikeway, and Stierman Way Bikeway
Project Type Community
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2025
Total Project Cost $250,000
Improvement Type Bike Facilities
Project Name Bikeway Signage (2026) - Includes South Channel Bikeway
Project Type Community
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2026
Total Project Cost $250,000
Improvement Type Bike Facilities
Project Name Eagle Rd and Ranch Dr Pedestrian Crossing (Eagle Improvements A)
Project Type Community
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year 2026
Total Project Cost $160,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity
Project Name Eagle Rd and State St - Includes Bridge #1033, Eagle and Plaza intersection, and State and 02nd St intersection
Project Type Livable Street
DESIGN YEAR 2020-2022
RIGHT-OF-WAY Year 2023
Construction Year 2024
Total Project Cost $9,208,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Floating Feather Rd and Ballantyne Ln (Floating Feather Corridor A)
Project Type Intersection
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year Future
Total Project Cost $1,444,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Floating Feather Rd and Palmer Ln (Floating Feather Corridor B)
Project Type Intersection
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $1,607,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Floating Feather Rd and Park Ln (Floating Feather Corridor A)
Project Type Intersection
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year Future
Total Project Cost $1,212,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Floating Feather Rd, Linder Rd / Park St (Floating Feather Corridor A)
Project Type Livable Street
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year Future
Total Project Cost $2,113,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Floating Feather Rd, Palmer Ln / Linder Rd (Floating Feather Corridor B)
Project Type Livable Street
DESIGN YEAR 2025
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $7,450,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Floating Feather Rd, Park Ln / Ballantyne Rd (Floating Feather Corridor A)
Project Type Livable Street
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year Future
Total Project Cost $6,163,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Horseshoe Bend Rd and Floating Feather Rd (Eagle Improvements B)
Project Type Community
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $194,000
Improvement Type Pedestrian Facilities, ADA Improvements,
Bike Facilities, Vehicular Capacity
Project Name Horseshoe Bend Rd, State St / Hill Rd - Includes Utahna Pedestrian Crossing
Project Type Livable Street
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2022
Construction Year Future
Total Project Cost $1,064,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Linder Rd and Floating Feather Rd Roundabout
Project Type Intersection
DESIGN YEAR 2022
RIGHT-OF-WAY Year 2022-2023
Construction Year 2026
Total Project Cost $4,103,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Linder Rd, Chinden Blvd (US 20/26) / SH 44 (State St) - South Phase - Includes Bridges #1078, #2033, and #2034
Project Type Livable Street
DESIGN YEAR 2024-2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $21,107,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Linder Rd, SH 44 (State St) / Floating Feather Rd - Includes Bridges #1021 and #1022
Project Type Livable Street
DESIGN YEAR 2020-2021
RIGHT-OF-WAY Year 2022-2023
Construction Year 2026
Total Project Cost $9,402,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Palmer Ln Bridge #1009, N/O Floating Feather Rd
Project Type Bridges
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2022
Construction Year 2023
Total Project Cost $121,000
Improvement Type Maintenance
Project Name Park Ln, SH44 (State St) / Floating Feather Rd (Eagle Improvements C)
Project Type Community
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $3,981,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Roadway and ADA Improvements (2023) Part 1 - Includes Edgewood, Hill / Floating Feather
Project Type Livable Street
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2022
Construction Year 2023
Total Project Cost $7,519,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Roadway and ADA Improvements (2023) Part 2 - Includes Beacon Light, SH 16 / Ballantyne
Project Type Livable Street
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2022
Construction Year 2023
Total Project Cost $2,504,000
Improvement Type ADA Improvements, Bike Facilities,
Maintenance
Project Name 32nd St, US 20/26 (Chinden Blvd) / Clay St
Project Type Livable Street
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2023
Construction Year Future
Total Project Cost $702,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name 33rd St, Brown St / US 20/26 (Chinden Blvd) (Garden City East Improvements B)
Project Type Livable Street
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $935,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name 33rd St, US 20/26 (Chinden Blvd) / Greenbelt (Garden City East Improvements A)
Project Type Livable Street
DESIGN YEAR 2023
RIGHT-OF-WAY Year 2024
Construction Year Future
Total Project Cost $1,051,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name 34th St, US 20/26 (Chinden Blvd) / Clay St (Garden City East Improvements A)
Project Type Livable Street
DESIGN YEAR 2023
RIGHT-OF-WAY Year 2024
Construction Year Future
Total Project Cost $633,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name 35th St, Brown St / US 20/26 (Chinden Blvd) (Garden City East Improvements B)
Project Type Livable Street
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $446,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name 35th St, US 20/26 (Chinden Blvd) / Greenbelt (Garden City East Improvements A)
Project Type Livable Street
DESIGN YEAR 2023
RIGHT-OF-WAY Year 2024
Construction Year Future
Total Project Cost $1,023,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name 37th St Bridge #1441, 350' SW/O Adams St
Project Type Bridges
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2022
Construction Year 2026
Total Project Cost $270,000
Improvement Type Maintenance
Project Name 43rd St Bikeway Connection, Ustick Rd / Greenbelt (Garden City West Improvements A)
Project Type Community
DESIGN YEAR 2025
RIGHT-OF-WAY Year N/A
Construction Year 2026
Total Project Cost $263,000
Improvement Type Bike Facilities
Project Name 43rd St, US 20/26 (Chinden Blvd) / Boise River (Garden City West Improvements A)
Project Type Livable Street
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $1,459,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name 43rd St, Ustick Rd / US 20/26 (Chinden Blvd) (Garden City West Improvements A)
Project Type Livable Street
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $622,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name 45th St Bridge #1432, 500' N/O US 20/26 (Chinden Blvd)
Project Type Bridges
DESIGN YEAR 2019
RIGHT-OF-WAY Year 2019
Construction Year 2022
Total Project Cost $144,000
Improvement Type Maintenance
Project Name Arney Ln, Riverside Dr / SH 44 (State St) (Garden City West Improvements B)
Project Type Community
DESIGN YEAR 2026 (Concept in 2022)
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $539,000
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name Bikeway Signage (2021) - Includes Bloom St Bikeway and Orchard Hill Bikeway
Project Type Community
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2022
Total Project Cost $419,000
Improvement Type Bike Facilities
Project Name Bikeway Signage (2025)
Project Type Community
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2025
Total Project Cost $250,000
Improvement Type Bike Facilities
Project Name Clay St, 34th St / 32nd St
Project Type Livable Street
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2023
Construction Year Future
Total Project Cost $853,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Clay St, 37th St / 34th St
Project Type Livable Street
DESIGN YEAR 2022
RIGHT-OF-WAY Year 2023- 2024
Construction Year Future
Total Project Cost $1,597,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Glenwood St, Goddard Rd / US 20/26 (Chinden Blvd) (West Bench Improvements A)
Project Type Livable Street
DESIGN YEAR 2023
RIGHT-OF-WAY Year 2024
Construction Year Future
Total Project Cost $762,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Kent St, US 20/26 (Chinden Blvd) / Alworth St (Garden City West Improvements A)
Project Type Community
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $743,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Mystic Cove Way Bike/Ped Connection (Garden City West Improvements C)
Project Type Community
DESIGN YEAR Future
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost TBD
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Osage St, 32nd St / 46th St (Garden City East Improvements C)
Project Type Community
DESIGN YEAR Future
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost TBD
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Osage St, 33rd St / 32nd St
Project Type Environmental
DESIGN YEAR Future
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $146,500
Improvement Type Pedestrian Facilities, ADA
Improvements, Maintenance
Project Name Reed St Realignment, N/O Adams St
Project Type Livable Street
DESIGN YEAR 2022
RIGHT-OF-WAY Year 2023
Construction Year 2024
Total Project Cost $481,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity
Project Name Riverside Dr, Strawberry Glenn Rd / Glenwood St (Garden City West Improvements A)
Project Type Livable Street
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $484,000
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name Roadway and ADA Improvements (2023) Part 1 - Includes Orchard, Emerald / Chinden
Project Type Community
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2022
Construction Year 2023
Total Project Cost $7,519,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name State St and Glenwood St
Project Type Intersection
DESIGN YEAR Future
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $17,200,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name State St and Pierce Park Ln - Includes State St widening from Hertford to Ellens Ferry
Project Type Intersection
DESIGN YEAR 2018-2022
RIGHT-OF-WAY Year 2022-2023
Construction Year 2025-2026
Total Project Cost $11,645,238
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name State St, Pierce Park Ln / Collister Dr
Project Type Livable Street
DESIGN YEAR Future
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $7,682,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Thurman Mill Bridge Projects Water Quality Mitigation
Project Type Environmental
DESIGN YEAR 2020
RIGHT-OF-WAY Year 2021
Construction Year 2022
Total Project Cost $434,000
Improvement Type Maintenance
Project Name US 20/26 (Chinden Blvd) and 43rd St Pedestrian Crossing
Project Type Community
DESIGN YEAR 2022
RIGHT-OF-WAY Year N/A
Construction Year 2023
Total Project Cost $251,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name US 20/26 (Chinden Blvd) and 50th St Pedestrian Crossing (Garden City West Improvements B)
Project Type Community
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $289,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name US 20/26 (Chinden Blvd) and Coffey St Pedestrian Crossing (Garden City West Improvements B)
Project Type Community
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $289,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Ustick Rd and 43rd St Pedestrian Crossing (Garden City West Improvements A)
Project Type Community
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $239,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name 02nd St, Avenue C / Linder Ave (Kuna Improvements B)
Project Type Livable Street
DESIGN YEAR 2025
RIGHT-OF-WAY Year N/A
Construction Year 2026
Total Project Cost $139,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Arterial & Collector Capital Maintenance (2024) HB312 Project - Includes Poen, Swan Falls / Cloverdale
Project Type Livable Street
DESIGN YEAR 2023
RIGHT-OF-WAY Year N/A
Construction Year 2024
Total Project Cost $3,509,000
Improvement Type Maintenance
Project Name Avalon St and Kay St (Kuna Improvements B)
Project Type Intersection
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $598,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity
Project Name Avalon St, Ten Mile Rd / School Ave (Kuna Improvements B)
Project Type Community
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $741,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Avenue A, 02nd St / Main St (Kuna Improvements A)
Project Type Livable Street
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year Future
Total Project Cost $109,000
Improvement Type Pedestrian Facilities, ADA Improvements
Project Name Avenue A, Main St / 4th St (Kuna Improvements A)
Project Type Livable Street
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year Future
Total Project Cost $147,000
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name Avenue B, 02nd St / Main St (Kuna Improvements C)
Project Type Livable Street
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $211,000
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name Avenue B, Main St / 4th St (Kuna Improvements A)
Project Type Livable Street
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year Future
Total Project Cost $147,000
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name Avenue C, Main St / 04th St
Project Type Livable Street
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2021
Construction Year 2022
Total Project Cost $538,000
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name Avenue D, Main St / 04th St (Kuna Improvements A)
Project Type Livable Street
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year Future
Total Project Cost $192,000
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name Black Cat Rd Bridge #1305, 0.21 miles N/O King Rd
Project Type Bridges
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2022
Construction Year 2026
Total Project Cost $648,000
Improvement Type Maintenance
Project Name Columbia Rd Bridge #1283, 0.2 miles E/O Ten Mile Rd
Project Type Bridges
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2022
Construction Year 2024
Total Project Cost $621,000
Improvement Type Maintenance
Project Name Kuna Middle School Zone, Ten Mile Ave and Boise St
Project Type Community
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2021
Construction Year 2022
Total Project Cost $521,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Linder Ave, Swan Falls Rd / 02nd St; Avalon St, Swan Falls Rd / Orchard Ave (Kuna Improvements A)
Project Type Community
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year Future
Total Project Cost $574,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Linder Rd, Main St / Deer Flat Rd - Includes new Emergency Signal and Porter Pedestrian Crossing
Project Type Livable Street
DESIGN YEAR 2021-2022
RIGHT-OF-WAY Year 2022-2023
Construction Year 2025
Total Project Cost $2,146,500
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Porter St and Cambrick Dr Pedestrian Crossing (Kuna Improvements B)
Project Type Community
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2025
Construction Year 2026
Total Project Cost $234,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Residential Capital Maintenance (2023) HB312 Project Part 1 - Includes 02nd, Linder / Orchard; Armand, San Mateo / Ash; Ashwood, E/O Ash; Boise, Shady Grove / Orchard; Curtner, San Mateo / Ash; Daniel, W/O Orchard; Gold, Strike / School; Hayward, Armand /
Project Type Livable Street
DESIGN YEAR 2021
RIGHT-OF-WAY Year N/A
Construction Year 2024
Total Project Cost $3,258,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Maintenance
Project Name School Ave Bikeway, King Rd / Deer Flat Rd (Kuna Improvements B)
Project Type Community
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2025
Construction Year 2026
Total Project Cost $98,000
Improvement Type Bike Facilities
Project Name Swan Falls Rd and Indian Creek Pedestrian Crossing (Kuna Improvements A)
Project Type Community
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year Future
Total Project Cost $145,000
Improvement Type Pedestrian Facilities, ADA Improvements,
Bike Facilities
Project Name Ten Mile Rd and Columbia Rd (Ten Mile Corridor B)
Project Type Intersection
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $2,387,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Ten Mile Rd and Deer Flat Rd (Ten Mile Corridor A)
Project Type Intersection
DESIGN YEAR 2022
RIGHT-OF-WAY Year 2023
Construction Year 2026
Total Project Cost $2,894,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Ten Mile Rd and Hubbard Rd (Ten Mile Corridor B)
Project Type Intersection
DESIGN YEAR 2024-2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $2,023,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Ten Mile Rd and Lake Hazel Rd (Ten Mile Corridor A)
Project Type Intersection
DESIGN YEAR 2022
RIGHT-OF-WAY Year 2023-2024
Construction Year Future
Total Project Cost $4,657,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Ten Mile Rd, Columbia Rd / Lake Hazel Rd (Ten Mile Corridor D)
Project Type Livable Street
DESIGN YEAR Future
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $5,393,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Ten Mile Rd, Deer Flat Rd / Hubbard Rd (Ten Mile Corridor C)
Project Type Livable Street
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $5,060,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Ten Mile Rd, Hubbard Rd / Columbia Rd (Ten Mile Corridor C)
Project Type Livable Street
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $5,106,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Western Heritage Byway (Swan Falls Rd), Initial Point / southern terminus
Project Type Community
DESIGN YEAR 2022-2024
RIGHT-OF-WAY Year N/A
Construction Year 2024-2025
Total Project Cost $5,372,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Bikeway Signage (2025) - Includes Pine Ave Bikeway
Project Type Community
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2025
Total Project Cost $250,000
Improvement Type Bike Facilities
Project Name Broadway Ave, West 08th St / West 04th St (Meridian Downtown Improvements C)
Project Type Livable Street
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $562,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name East 03rd St, Franklin Rd / Carlton St (Meridian Downtown Improvements A)
Project Type Livable Street
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year Future
Total Project Cost $1,980,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name East 2 1/2 St, Carlton Ave / Fairview Ave (Meridian Downtown Improvements B) - Includes roadway maintenance
Project Type Community
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $699,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Maintenance
Project Name Fairview Ave and Locust Grove Rd
Project Type Intersection
DESIGN YEAR 2020-2021
RIGHT-OF-WAY Year 2022-2023
Construction Year 2025
Total Project Cost $8,557,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Federal Aid Capital Maintenance (2021) - Phase 3 - Includes West 08th, Pine / Cherry
Project Type Maintenance
DESIGN YEAR 2019-2020
RIGHT-OF-WAY Year N/A
Construction Year 2022
Total Project Cost $767,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Maintenance
Project Name Linder Rd, Overland Rd / Franklin Rd - Includes Bridge #1537 replacement
Project Type Livable Street
DESIGN YEAR 2022
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $21,421,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Linder-Meridian Bikeway, Pine Ave / Temple Dr (North Meridian Improvements A)
Project Type Community
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year Future
Total Project Cost $464,000
Improvement Type Pedestrian Facilities, ADA Improvements,
Bike Facilities
Project Name Locust Grove Rd and Woodbridge Dr Pedestrian Crossing (Meridian Downtown Improvements A)
Project Type Community
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year Future
Total Project Cost $192,500
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Main St and King St Pedestrian Crossing (Meridian Downtown Improvements A)
Project Type Community
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year 2026
Total Project Cost $146,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Meridian Stormwater Mitigation Project (Meridian Downtown Improvements A)
Project Type Environmental
DESIGN YEAR 2023
RIGHT-OF-WAY Year 2023
Construction Year 2024
Total Project Cost $213,000
Improvement Type Maintenance
Project Name Pine Ave and West 01st St Pedestrian Crossing (Meridian Downtown Improvements A)
Project Type Community
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year Future
Total Project Cost $157,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Pine Ave, Meridian Rd / Locust Grove Rd - Pine Ave Basin
Project Type Community
DESIGN YEAR 2016
RIGHT-OF-WAY Year 2017
Construction Year 2018-2022
Total Project Cost $104,000
Improvement Type Maintenance
Project Name Residential Capital Maintenance (2022) HB312 Project - Includes Bower, Main / east end; Broadway, East 03rd / East 06th; Carlton, Main / 2 1/2; Cherry, West 04th / Meridian; East 02nd, Broadway / Carlton; East 04th, Broadway / State; East 04th, N/O Washin
Project Type Maintenance
DESIGN YEAR 2020
RIGHT-OF-WAY Year N/A
Construction Year 2022-2023
Total Project Cost $5,448,000
Improvement Type ADA Improvements, Maintenance
Project Name Residential Capital Maintenance (2023) HB312 Project Part 2 - Includes Rose, West 01st / West 01st; and West 01st, S/O Franklin
Project Type Livable Street
DESIGN YEAR 2021
RIGHT-OF-WAY Year N/A
Construction Year 2024
Total Project Cost $3,263,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Maintenance
Project Name Washington St, 07th St / Main St (Meridian Downtown Improvements C)
Project Type Community
DESIGN YEAR Future
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost TBD
Improvement Type Pedestrian Facilities, ADA
Improvements, Maintenance
Project Name Bikeway Signage (2025) - Includes Pine Ave Bikeway
Project Type Community
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2025
Total Project Cost $250,000
Improvement Type Bike Facilities
Project Name Bikeway Signage (2026) - Includes Central Meridian Bikeway and Chinden-McMillan Bikeway (Phase 2 & 3)
Project Type Community
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2026
Total Project Cost $250,000
Improvement Type Bike Facilities
Project Name Bower St, Meridian Rd / 03rd St (North Meridian Improvements D)
Project Type Community
DESIGN YEAR Future
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost TBD
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name Fairview Ave and Locust Grove Rd
Project Type Intersection
DESIGN YEAR 2020-2021
RIGHT-OF-WAY Year 2022-2023
Construction Year 2025
Total Project Cost $8,557,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Fairview Ave, Locust Grove Rd / SH 55 (Eagle Rd)
Project Type Livable Street
DESIGN YEAR 2020-2021
RIGHT-OF-WAY Year 2022-2023
Construction Year 2025
Total Project Cost $5,553,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Franklin Rd and McDermott Rd (North Meridian Improvements C)
Project Type Intersection
DESIGN YEAR Future
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $1,610,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Franklin Rd, McDermott Rd / Black Cat Rd (Franklin Corridor Improvements A)
Project Type Livable Street
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $6,995,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Linder Rd, Cherry Ln / Ustick Rd (North Meridian Improvements B)
Project Type Livable Street
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $5,847,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Linder Rd, Chinden Blvd (US 20/26) / SH 44 (State St) - South Phase - Includes Bridges #1078, #2033, and #2034
Project Type Livable Street
DESIGN YEAR 2024-2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $21,107,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Linder Rd, Overland Rd / Franklin Rd - Includes Bridge #1537
Project Type Livable Street
DESIGN YEAR 2022
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $21,421,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Linder-Meridian Bikeway, Pine Ave / Temple Dr (North Meridian Improvements A)
Project Type Community
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year Future
Total Project Cost $464,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Locust Grove Rd and Woodbridge Dr Pedestrian Crossing (Meridian Downtown Improvements A)
Project Type Community
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year Future
Total Project Cost $192,500
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Locust Grove Rd, Fairview Ave / Ustick Rd (Locust Grove Corridor B)
Project Type Livable Street
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $9,337,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Locust Grove Rd, McMillan Rd / US 20/26 (Chinden Blvd) (Locust Grove Corridor A)
Project Type Livable Street
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $4,046,000
Improvement Type Pedestrian Facilities, ADA Improvements,
Bike Facilities, Vehicular Capacity, Maintenance
Project Name Locust Grove Rd, Ustick Rd / McMillan Rd (Locust Grove Corridor A)
Project Type Livable Street
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $4,524,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name McMillan Rd and Black Cat Rd Roundabout
Project Type Intersection
DESIGN YEAR 2021-2022
RIGHT-OF-WAY Year 2023
Construction Year Future
Total Project Cost $2,455,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name McMillan Rd and Palatine Way Pedestrian Crossing (North Meridian Improvements A)
Project Type Community
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year Future
Total Project Cost $453,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name McMillan Rd, Cortana Way / Goddard Creek Way (North Meridian Improvements B)
Project Type Community
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $455,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name McMillan Rd, Montelino Way / 775' E/O Montelino Way (North Meridian Improvements A)
Project Type Community
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year Future
Total Project Cost $33,500
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name McMillan Rd, Red Horse Way / Locust Grove Rd (North Meridian Improvements A)
Project Type Community
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year 2026
Total Project Cost $363,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Meridian Rd, McMillan Rd / US 20/26 (Chinden Blvd) (Meridian Corridor A)
Project Type Livable Street
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $3,476,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Meridian Rd, Ustick Rd / McMillan Rd (Meridian Corridor A)
Project Type Livable Street
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $2,069,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Park Creek Dr and Deer Creek Ln Pedestrian Improvements (North Meridian Improvements D)
Project Type Community
DESIGN YEAR Future
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost TBD
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name Residential Capital Maintenance (2023) HB312 Project Part 2 - Includes Blossom, south end / north end; Interlachen, W/O Interlachen; Larkspur, S/O Verbena; Laurel, S/O Verbena; Lavender, S/O Verbena; Lawndale, McGlinchey / Crestmont; Lilac, S/O Verbena; M
Project Type Livable Street
DESIGN YEAR 2021
RIGHT-OF-WAY Year N/A
Construction Year 2024
Total Project Cost $3,263,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Maintenance
Project Name Roadway and ADA Improvements (2023) Part 1 - Includes McDermott, McMillan / Chinden
Project Type Livable Street
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2022
Construction Year 2023
Total Project Cost $7,519,000
Improvement Type Maintenance
Project Name Star Rd Bridge #1092, 0.35 miles S/O US 20/26 (Chinden Blvd) (North Meridian Improvements B)
Project Type Bridges
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $711,000
Improvement Type Maintenance
Project Name Star Rd Bridge #1093, 0.25 miles S/O McMillan Rd
Project Type Bridges
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2022
Construction Year 2023
Total Project Cost $294,000
Improvement Type Maintenance
Project Name Star Rd Bridge #2040, 0.28 miles S/O McMillan Rd
Project Type Bridges
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2022
Construction Year 2023
Total Project Cost $864,000
Improvement Type Maintenance
Project Name US 20/26 (Chinden Blvd) and Star Rd
Project Type Intersection
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2022
Construction Year 2023
Total Project Cost $1,740,000
Improvement Type Vehicular Capacity
Project Name Ustick Rd and Black Cat Rd (Ustick Corridor A)
Project Type Intersection
DESIGN YEAR 2022
RIGHT-OF-WAY Year 2023
Construction Year 2024
Total Project Cost $4,996,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Ustick Rd and Black Cat Rd Interim Signal
Project Type Intersection
DESIGN YEAR 2020-2021
RIGHT-OF-WAY Year 2022
Construction Year 2021-2022
Total Project Cost $831,000
Improvement Type Vehicular Capacity
Project Name Ustick Rd and McDermott Rd (Ustick Corridor B)
Project Type Intersection
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $6,141,000
Improvement Type Pedestrian Facilities, ADA Improvements,
Bike Facilities, Vehicular Capacity, Maintenance
Project Name Ustick Rd Maintenance Yard
Project Type Miscellaneous
DESIGN YEAR 2021-2022
RIGHT-OF-WAY Year N/A
Construction Year 2022-2029
Total Project Cost $24,400,00
Improvement Type Maintenance
Project Name Ustick Rd, Black Cat Rd / Ten Mile Rd (Ustick Corridor A) - Includes Naomi Signal
Project Type Livable Street
DESIGN YEAR 2022
RIGHT-OF-WAY Year 2023
Construction Year 2024
Total Project Cost $4,685,600
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Ustick Rd, McDermott Rd / Black Cat Rd (Ustick Corridor B)
Project Type Livable Street
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $5,634,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Ustick Rd, Star Rd / McDermott Rd (Ustick Corridor B)
Project Type Livable Street
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $5,677,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Ustick Rd, Ten Mile Rd / Linder Rd (Ustick Corridor A)
Project Type Livable Street
DESIGN YEAR 2022
RIGHT-OF-WAY Year 2023
Construction Year 2025
Total Project Cost $3,795,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Wells St Bridge #1224, 0.2 miles S/O Magic View Dr (North Meridian Improvements B)
Project Type Bridges
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $618,000
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name Amity Rd and Locust Grove Rd Roundabout
Project Type Intersection
DESIGN YEAR 2021-2022
RIGHT-OF-WAY Year 2022
Construction Year 2025
Total Project Cost $2,373,000
Improvement Type Pedestrian Facilities, ADA Improvements,
Bike Facilities, Vehicular Capacity, Maintenance
Project Name Arterial & Collector Capital Maintenance (2022) HB312 Project - Includes Amity, Meridian / Locust Grove; and Victory, Black Cat / Ten Mile
Project Type Maintenance
DESIGN YEAR 2021
RIGHT-OF-WAY Year N/A
Construction Year 2022
Total Project Cost $700,000
Improvement Type ADA Improvements, Maintenance
Project Name Aspen Cove Dr Bridge #2084, 280' W/O Linder Rd (South Meridian Improvements B)
Project Type Bridges
DESIGN YEAR 2025
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $598,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Maintenance
Project Name Eagle Rd and Amity Rd Roundabout (Dual Lane)
Project Type Intersection
DESIGN YEAR 2020
RIGHT-OF-WAY Year 2020
Construction Year 2022
Total Project Cost $3,258,500
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Eagle Rd, Amity Rd / Victory Rd - Includes Eagle and Rome Pedestrian Crossing and Eagle and Zaldia Roundabout
Project Type Livable Street
DESIGN YEAR 2018
RIGHT-OF-WAY Year 2019-2020
Construction Year 2022
Total Project Cost $6,076,500
Improvement Type Pedestrian Facilities, ADA Improvements,
Bike Facilities, Vehicular Capacity, Maintenance
Project Name Eagle Rd, Lake Hazel Rd / Amity Rd - Includes Eagle and Taconic Roundabout
Project Type Livable Street
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2022-2023
Construction Year 2025
Total Project Cost $7,355,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Lake Hazel Rd and Eagle Rd
Project Type Intersection
DESIGN YEAR 2020
RIGHT-OF-WAY Year 2022-2023
Construction Year 2024
Total Project Cost $8,407,300
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Lake Hazel Rd, Eagle Rd / Cloverdale Rd (Lake Hazel Corridor A) Includes Ten Mile Creek Bridge
Project Type Livable Street
DESIGN YEAR 2022
RIGHT-OF-WAY Year 2023
Construction Year 2026
Total Project Cost $6,656,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Lake Hazel Rd, Eagle Rd / Locust Grove Rd
Project Type Livable Street
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2021
Construction Year 2022- 2023
Total Project Cost $2,500,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Linder Rd, Overland Rd / Franklin Rd - Includes Bridge #1537
Project Type Livable Street
DESIGN YEAR 2022
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $21,421,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Locust Grove Rd and Palermo Dr Pedestrian Crossing (South Meridian Improvements A)
Project Type Community
DESIGN YEAR 2022
RIGHT-OF-WAY Year 2023
Construction Year Future
Total Project Cost $387,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Locust Grove Rd Bridge #1207, 0.17 miles S/O Victory Rd (South Meridian Improvements A)
Project Type Bridges
DESIGN YEAR 2022
RIGHT-OF-WAY Year 2023
Construction Year 2026
Total Project Cost $613,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Locust Grove Rd, Amity Rd / Victory Rd (Locust Grove Corridor B)
Project Type Livable Street
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $5,145,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Locust Grove Rd, Victory Rd / Overland Rd - Includes Bridge #2087
Project Type Livable Street
DESIGN YEAR 2019
RIGHT-OF-WAY Year 2020-2021
Construction Year 2023
Total Project Cost $7,516,500
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Overland Rd and Eagle Rd (South Meridian Improvements B)
Project Type Livable Street
DESIGN YEAR Future (Concept in 2023)
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $6,115,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Overland Rd and Linder Rd
Project Type Intersection
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2021
Construction Year 2022
Total Project Cost $255,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Residential Capital Maintenance (2023) HB312 Project Part 2 - Includes Country Terrace, S/O Overland; Francine, N/O Victory; and Tobago, W/O West 5th
Project Type Livable Street
DESIGN YEAR 2021
RIGHT-OF-WAY Year N/A
Construction Year 2024
Total Project Cost $3,263,000
Improvement Type Pedestrian Facilities, ADA Improvements,
Maintenance
Project Name Stoddard Rd, Victory Rd / Overland Rd (South Meridian Improvements A) - Includes Bridge #2085 and Victory Enhanced Crossing
Project Type Livable Street
DESIGN YEAR 2022
RIGHT-OF-WAY Year 2023
Construction Year Future
Total Project Cost $5,738,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity
Project Name Ten Mile Rd and Lake Hazel Rd (Ten Mile Corridor A)
Project Type Intersection
DESIGN YEAR 2022
RIGHT-OF-WAY Year 2023-2024
Construction Year Future
Total Project Cost $4,657,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Ten Mile Rd and Victory Rd - Includes Bridge #1181
Project Type Intersection
DESIGN YEAR 2019-2020
RIGHT-OF-WAY Year 2020-2021
Construction Year 2022-2023
Total Project Cost $4,200,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Ten Mile Rd, Victory Rd / Overland Rd
Project Type Livable Street
DESIGN YEAR 2019
RIGHT-OF-WAY Year 2020-2021
Construction Year 2022-2023
Total Project Cost $3,511,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Topaz Ave Bridge #1220, 0.1 miles N/O Overland Rd
Project Type Bridges
DESIGN YEAR 2022
RIGHT-OF-WAY Year 2023
Construction Year 2025
Total Project Cost $577,000
Improvement Type Maintenance
Project Name Victory Rd and Locust Grove Rd Roundabout - Includes Bridge #2116
Project Type Intersection
DESIGN YEAR 2019-2020
RIGHT-OF-WAY Year 2020-2021
Construction Year 2023
Total Project Cost $4,165,400
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Victory Rd, Eagle Rd / Cloverdale Rd (Victory Corridor B)
Project Type Livable Street
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $3,990,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Victory Rd, Linder Rd / Meridian Rd (Victory Corridor D)
Project Type Livable Street
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $5,494,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Victory Rd, Locust Grove Rd / Eagle Rd (Victory Corridor B)
Project Type Livable Street
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $5,392,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Victory Rd, SH 69 (Meridian Rd) / Locust Grove Rd (Victory Corridor B)
Project Type Livable Street
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $3,689,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity, Maintenance
Project Name Arterial & Collector Capital Maintenance (2023) HB312 Project - Includes New Hope, Can Ada / Wing
Project Type Livable Street
DESIGN YEAR 2022
RIGHT-OF-WAY Year N/A
Construction Year 2023
Total Project Cost $1,323,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Brandon Rd Bridge #1460, 550' N/O Floating Feather Rd (2022 Bridges)
Project Type Bridges
DESIGN YEAR 2022
RIGHT-OF-WAY Year 2023
Construction Year 2025
Total Project Cost $634,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Can Ada Rd Bridge #1004, 740' N/O SH 44 (State St) (Star Improvements A)
Project Type Bridges
DESIGN YEAR 2023
RIGHT-OF-WAY Year 2024
Construction Year 2025
Total Project Cost $166,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Floating Feather Rd Bridge #2028, 580' E/O Munger Rd
Project Type Bridges
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2022
Construction Year 2026
Total Project Cost $2,310,500
Improvement Type Pedestrian Facilities, ADA
Improvements, Maintenance
Project Name Floating Feather Rd, Brandon Rd / Hornback Ave
Project Type Community
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2022
Construction Year 2025
Total Project Cost $353,000
Improvement Type Pedestrian Facilities, ADA
Improvements
Project Name Munger Rd Bridge #1005 and #2001, 1/2 mile S/O New Hope Rd (Star Improvements A)
Project Type Bridges
DESIGN YEAR 2023
RIGHT-OF-WAY Year 2024
Construction Year 2025
Total Project Cost $1,269,800
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Munger Rd Bridge #1462, 550' S/O New Hope Rd
Project Type Bridges
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2022
Construction Year 2024
Total Project Cost $360,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Pollard Ln, Floating Feather Rd / Star Middle School (Star Improvements A)
Project Type Community
DESIGN YEAR 2023
RIGHT-OF-WAY Year 2024
Construction Year 2025
Total Project Cost $314,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Star Rd, Borealis St / Hidden Brook Dr (Star Improvements B)
Project Type Community
DESIGN YEAR Future
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost TBD
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name Star Rd, Main St / SH 44 (State St) (Star Improvements A)
Project Type Livable Street
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year Future
Total Project Cost $1,296,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities
Project Name US 20/26 (Chinden Blvd) and Star Rd
Project Type Intersection
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2022
Construction Year 2023
Total Project Cost $1,740,000
Improvement Type Vehicular Capacity
Project Name Arterial & Collector Capital Maintenance (2025) HB312 Project
Project Type Livable Street
DESIGN YEAR 2023
RIGHT-OF-WAY Year N/A
Construction Year 2025
Total Project Cost $3,935,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Arterial & Collector Capital Maintenance (2026) HB312 Project
Project Type Livable Street
DESIGN YEAR 2024
RIGHT-OF-WAY Year N/A
Construction Year 2026
Total Project Cost $2,935,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Arterial & Collector Capital Maintenance (2027) HB312 Project
Project Type Livable Street
DESIGN YEAR 2025
RIGHT-OF-WAY Year N/A
Construction Year 2027
Total Project Cost $2,935,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Arterial & Collector Capital Maintenance (2028) HB312 Project
Project Type Livable Street
DESIGN YEAR 2026
RIGHT-OF-WAY Year N/A
Construction Year 2028
Total Project Cost $2,935,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Arterial Dynamic Message Sign Installation
Project Type Traffic Safety & Ops
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2024
Total Project Cost $320,000
Improvement Type Vehicular Capacity
Project Name Bridge Preventative Maintenance (2022)
Project Type Bridges
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2022
Total Project Cost $200,000
Improvement Type Maintenance
Project Name Bridge Preventative Maintenance (2023)
Project Type Bridges
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2023
Total Project Cost $200,000
Improvement Type Maintenance
Project Name Bridge Preventative Maintenance (2024)
Project Type Bridges
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2024
Total Project Cost $200,000
Improvement Type Maintenance
Project Name Bridge Preventative Maintenance (2025)
Project Type Bridges
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2025
Total Project Cost $200,000
Improvement Type Maintenance
Project Name Bridge Preventative Maintenance (2026)
Project Type Bridges
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2026
Total Project Cost $200,000
Improvement Type Maintenance
Project Name Corridor Preservation - Impact Fee Eligible (2021)
Project Type Cooperative
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year N/A
Total Project Cost $2,400,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity
Project Name Corridor Preservation - Impact Fee Eligible (2022)
Project Type Cooperative
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year N/A
Total Project Cost $8,000,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity
Project Name Corridor Preservation - Impact Fee Eligible (2023)
Project Type Cooperative
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year N/A
Total Project Cost $4,500,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity
Project Name Corridor Preservation - Impact Fee Eligible (2024)
Project Type Cooperative
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year N/A
Total Project Cost $1,500,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity
Project Name Corridor Preservation - Impact Fee Eligible (2025)
Project Type Cooperative
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year N/A
Total Project Cost $1,500,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity
Project Name Corridor Preservation - Impact Fee Eligible (2026)
Project Type Cooperative
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year N/A
Total Project Cost $1,500,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity
Project Name Corridor Preservation - Non-Impact Fee Eligible (2021)
Project Type Cooperative
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year N/A
Total Project Cost $450,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity
Project Name Corridor Preservation - Non-Impact Fee Eligible (2022)
Project Type Cooperative
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year N/A
Total Project Cost $450,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity
Project Name Corridor Preservation - Non-Impact Fee Eligible (2023)
Project Type Cooperative
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year N/A
Total Project Cost $200,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity
Project Name Corridor Preservation - Non-Impact Fee Eligible (2024)
Project Type Cooperative
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year N/A
Total Project Cost $200,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity
Project Name Corridor Preservation - Non-Impact Fee Eligible (2025)
Project Type Cooperative
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year N/A
Total Project Cost $200,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity
Project Name Corridor Preservation - Non-Impact Fee Eligible (2026)
Project Type Cooperative
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year N/A
Total Project Cost $200,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity
Project Name Cul-de-Sac Reconstruct (2023) HB312 Project
Project Type Maintenance
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2023
Total Project Cost $400,000
Improvement Type Maintenance
Project Name Cul-de-Sac Reconstruct (2024) HB312 Project
Project Type Maintenance
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2024
Total Project Cost $400,000
Improvement Type Maintenance
Project Name Cul-de-Sac Reconstruct (2025) HB312 Project
Project Type Maintenance
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2025
Total Project Cost $400,000
Improvement Type Maintenance
Project Name Cul-de-Sac Reconstruct (2026) HB312 Project
Project Type Maintenance
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2026
Total Project Cost $400,000
Improvement Type Maintenance
Project Name Cul-de-Sac Repair (2023) HB312 Project
Project Type Maintenance
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2023
Total Project Cost $400,000
Improvement Type Maintenance
Project Name Cul-de-Sac Repair (2024) HB312 Project
Project Type Maintenance
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2024
Total Project Cost $400,000
Improvement Type Maintenance
Project Name Cul-de-Sac Repair (2025) HB312 Project
Project Type Maintenance
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2025
Total Project Cost $400,000
Improvement Type Maintenance
Project Name Cul-de-Sac Repair (2026) HB312 Project
Project Type Maintenance
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2026
Total Project Cost $400,000
Improvement Type Maintenance
Project Name Developers Cooperative Projects (2022)
Project Type Cooperative
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2022
Total Project Cost $600,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity
Project Name Developers Cooperative Projects (2023)
Project Type Cooperative
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2023
Total Project Cost $600,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity
Project Name Developers Cooperative Projects (2024)
Project Type Cooperative
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2024
Total Project Cost $300,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity
Project Name Developers Cooperative Projects (2025)
Project Type Cooperative
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2025
Total Project Cost $300,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity
Project Name Developers Cooperative Projects (2026)
Project Type Cooperative
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2026
Total Project Cost $300,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Vehicular Capacity
Project Name Fiber Optic Cable Network Update
Project Type Traffic Safety & Ops
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2024
Total Project Cost $100,000
Improvement Type Vehicular Capacity, Maintenance
Project Name Friction Seal of Bike Lanes (2023) Project
Project Type Livable Street
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2023
Total Project Cost $150,000
Improvement Type Bike Facilities, Maintenance
Project Name Grandmason Rd Bridge #1055, 0.25 miles N/O Chaparral Rd
Project Type Bridges
DESIGN YEAR 2026
RIGHT-OF-WAY Year Future
Construction Year Future
Total Project Cost $773,000
Improvement Type Maintenance
Project Name Green Stormwater Implementation (2022)
Project Type Environmental
DESIGN YEAR 2021
RIGHT-OF-WAY Year N/A
Construction Year 2022
Total Project Cost $469,000
Improvement Type Maintenance
Project Name Green Stormwater Implementation (2025)
Project Type Environmental
DESIGN YEAR 2024
RIGHT-OF-WAY Year N/A
Construction Year 2025
Total Project Cost $500,000
Improvement Type Maintenance
Project Name Green Stormwater Implementation (2026)
Project Type Environmental
DESIGN YEAR 2025
RIGHT-OF-WAY Year N/A
Construction Year 2026
Total Project Cost $500,000
Improvement Type Maintenance
Project Name Hanley Pl Bridge #1056, 700' N/O Chaparral Rd
Project Type Bridges
DESIGN YEAR 2021
RIGHT-OF-WAY Year 2022
Construction Year 2024
Total Project Cost $712,000
Improvement Type Maintenance
Project Name Maintenance Crack Seal (2022) HB312 Project
Project Type Maintenance
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2022
Total Project Cost $325,000
Improvement Type Maintenance
Project Name Maintenance Crack Seal (2023) HB312 Project
Project Type Maintenance
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2023
Total Project Cost $325,000
Improvement Type Maintenance
Project Name Maintenance Crack Seal (2024) HB312 Project
Project Type Maintenance
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2024
Total Project Cost $325,000
Improvement Type Maintenance
Project Name Maintenance Crack Seal (2025) HB312 Project
Project Type Maintenance
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2025
Total Project Cost $325,000
Improvement Type Maintenance
Project Name Maintenance Crack Seal (2026) HB312 Project
Project Type Maintenance
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2026
Total Project Cost $325,000
Improvement Type Maintenance
Project Name Microseal (2024) - HB312 Project
Project Type Maintenance
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2024
Total Project Cost $500,000
Improvement Type Maintenance
Project Name Microseal (2025) - HB312 Project
Project Type Maintenance
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2025
Total Project Cost $500,000
Improvement Type Maintenance
Project Name Microseal (2026) - HB312 Project
Project Type Maintenance
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2026
Total Project Cost $500,000
Improvement Type Maintenance
Project Name Residential Capital Maintenance (2025) HB312 Project
Project Type Livable Street
DESIGN YEAR 2023
RIGHT-OF-WAY Year 2024
Construction Year 2025
Total Project Cost $7,515,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Residential Capital Maintenance (2026) HB312 Project
Project Type Livable Street
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year 2026
Total Project Cost $8,608,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Residential Capital Maintenance (2027) HB312 Project
Project Type Livable Street
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year 2027
Total Project Cost $8,608,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Residential Capital Maintenance (2028) HB312 Project
Project Type Livable Street
DESIGN YEAR 2026
RIGHT-OF-WAY Year 2027
Construction Year Future
Total Project Cost $8,608,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Roadway and ADA Improvements (2025)
Project Type Livable Street
DESIGN YEAR 2023
RIGHT-OF-WAY Year 2024
Construction Year 2025
Total Project Cost $8,040,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Roadway and ADA Improvements (2026)
Project Type Livable Street
DESIGN YEAR 2024
RIGHT-OF-WAY Year 2025
Construction Year 2026
Total Project Cost $8,189,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Roadway and ADA Improvements (2027)
Project Type Livable Street
DESIGN YEAR 2025
RIGHT-OF-WAY Year 2026
Construction Year 2027
Total Project Cost $8,415,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Roadway and ADA Improvements (2028)
Project Type Livable Street
DESIGN YEAR 2026
RIGHT-OF-WAY Year 2027
Construction Year 2028
Total Project Cost $6,155,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Bike Facilities, Maintenance
Project Name Safe Sidewalk Program (2025)
Project Type Community
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2025
Total Project Cost $1,600,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Maintenance
Project Name Safe Sidewalk Program (2026)
Project Type Community
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2026
Total Project Cost $1,600,000
Improvement Type Pedestrian Facilities, ADA
Improvements, Maintenance
Project Name Traffic Signals New and Upgraded (2022)
Project Type Traffic Safety & Ops
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2022
Total Project Cost $600,000
Improvement Type Vehicular Capacity, Maintenance
Project Name Traffic Signals New and Upgraded (2023)
Project Type Traffic Safety & Ops
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2023
Total Project Cost $300,000
Improvement Type Vehicular Capacity, Maintenance
Project Name Traffic Signals New and Upgraded (2024)
Project Type Traffic Safety & Ops
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2024
Total Project Cost $300,000
Improvement Type Vehicular Capacity, Maintenance
Project Name Traffic Signals New and Upgraded (2025)
Project Type Traffic Safety & Ops
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2025
Total Project Cost $300,000
Improvement Type Vehicular Capacity, Maintenance
Project Name Traffic Signals New and Upgraded (2026)
Project Type Traffic Safety & Ops
DESIGN YEAR N/A
RIGHT-OF-WAY Year N/A
Construction Year 2026
Total Project Cost $300,000
Improvement Type Vehicular Capacity, Maintenance